Build a Power Plan Before You Commit to a Campus

Power availability has become a defining factor in data center development. A site may offer suitable land, fiber connectivity and favorable construction conditions, yet still face years of electrical infrastructure upgrades before it can support the required load.

PowerTek works with hyperscale and colocation data center developers, operators, landowners and infrastructure investors to evaluate potential sites, assess grid connection feasibility and develop practical power supply strategies.

Energized land Large-load interconnection On-site power and BESS
Diagram: a data center campus energizing in four phases from the grid and on-site power, from 200 MW in year one to 800 MW in year four

Data Centers & Digital Infrastructure

Power Availability, Grid Interconnection & Infrastructure Advisory

Our work spans early site selection, energized land assessments, large-load interconnection, dedicated generation, electrical infrastructure planning and investment due diligence.

With power systems engineering experience dating to 1994, PowerTek brings established transmission planning, grid modeling and utility engineering expertise to the technical and commercial decisions shaping data center development.

High-voltage substation beside a data center campus under construction

800 MW

Hyperscale load assessed for feasibility and grid interconnection

400 MW

Behind-the-meter hybrid generation evaluated for a hyperscale data center

600 MW

Campus power procurement and interconnection cost assessment

1994

Established, and working on complex grid engineering ever since

How we help

How PowerTek Supports Data Center Development

Site

Energized Land, Powered Sites & Site Selection

A nearby substation or high-voltage transmission line does not necessarily indicate available electrical capacity. PowerTek evaluates prospective energized land, powered shell sites and undeveloped properties to determine their potential suitability for data center development.

Energized Land & Powered Site Development →

Assessments examine transmission corridor proximity, available utility infrastructure, potential points of interconnection (POIs), substation and transformer capacity constraints, voltage levels, network reinforcement requirements and indicative time to power.

For developers comparing multiple locations, PowerTek provides technical site screening and power feasibility assessments to identify material grid constraints before significant capital is committed to land acquisition or development.

Connection

Grid Interconnection & Utility Capacity Assessment

PowerTek supports large-load interconnection studies, POI feasibility, utility capacity assessments and coordination with transmission providers, utilities and relevant system operators.

Grid Interconnection & Site Power Feasibility →

Engineering analysis can include power flow, contingency, short-circuit, voltage stability, protection coordination and power quality assessments. These studies help determine whether proposed capacity can be supported, what network upgrades may be required and which technical issues could affect the interconnection schedule.

For multi-building campuses and large hyperscale developments, PowerTek also assesses phased energization strategies, allowing developers to evaluate whether initial capacity can be delivered while infrastructure supporting later development phases is completed.

On-site power

Dedicated Power, On-Site Generation & Energy Storage

Where utility supply is constrained, PowerTek evaluates alternative and supplemental power configurations, including behind-the-meter (BTM) generation, natural gas-fired generation, cogeneration, battery energy storage systems (BESS) and hybrid power arrangements.

Data Center Power Infrastructure & Energized Land →

These assessments examine generation sizing, operating characteristics, grid interaction, fuel supply considerations, interconnection requirements, reliability and capital costs. Microgrid configurations and front-of-meter supply arrangements may also be evaluated where appropriate.

The objective is to establish which alternatives are technically feasible, commercially defensible and compatible with the facility's operating requirements.

Reliability

Mission-Critical Electrical Infrastructure & Reliability

Data centers require electrical infrastructure that can support continuous operations, changing load profiles and future capacity expansion.

Power Systems Engineering & Grid Reliability →

PowerTek provides power system engineering and technical review for data center electrical infrastructure, including high-voltage connections, substations, transformers, switchgear, protection systems, power quality and backup generation interfaces.

The firm also supports electrical planning and engineering coordination for scalable power infrastructure, UPS systems, redundancy configurations and phased campus expansion. Where applicable, assessments consider N+1 and 2N redundancy requirements and the electrical implications of the project's intended Uptime Institute Tier III or Tier IV design objectives.

Commercial

Power Procurement, Agreements & Project Economics

Power supply decisions have direct implications for development costs, operating expenditure and long-term investment returns.

PowerTek provides technical and commercial advisory support for utility service arrangements, Power Purchase Agreements (PPAs), Energy Service Agreements (ESAs), interconnection agreements and dedicated power supply options.

Energy Markets, Commercial & Investment Advisory →

Work can include utility tariff assessment, network upgrade cost estimation, capital expenditure analysis, energy procurement alternatives and technical inputs to project financial models. Renewable power procurement, renewable energy credits and carbon-free energy objectives may also be evaluated where relevant to the project's energy strategy.

These assessments help developers understand how electricity infrastructure requirements, supply commitments and energization schedules affect project economics.

Due diligence

Independent Technical Due Diligence & Investment Risk

For data center acquisitions, powered-land investments and development-stage transactions, PowerTek provides independent engineering and technical due diligence focused on electrical infrastructure and energy supply.

Independent & Lender's Engineering →

Assessments review utility capacity assumptions, interconnection status, network upgrade exposure, projected energization dates, infrastructure requirements and potential supply constraints.

The findings help investors and developers distinguish technically supported project assumptions from unresolved dependencies, evaluate capital requirements and assess the risk of committing funds to sites that cannot secure the required power within the intended development schedule.

Case studies

Selected Data Center Work

For large-load developments, the first question is whether the local grid can support the proposed capacity on the required schedule.

View Our Projects

Client details are withheld for confidential engagements.

Start a project

What Are You Building?

Planning a data center, connecting a power project or preparing an investment? Tell us what the project needs and where it stands. We will direct your inquiry to the people best placed to help.