Engineering – Project Management Support Services Master Service Agreement for services for 3 years. Planning and Operational Qulliq Energy Corporation, Nunavut Canada Canada http://www.qec.nu.ca/ 2021 to 2024 Objectives/background/needs:
As, if and when requested services award: Transmission, distribution, smart grid, alternative energy and integration of alternate energy, BESS: Review and advise on technical queries, Cost estimation / verification, Engineering and field service during construction, testing, substantial / final completion and hand overs, Prepare technical specification and drawing for Request for Proposals or Request for Tenders or Request for Quotations, Technical bid review and evaluation, Review technical documents and drawings and provide recommendations with justifications. Overall Scope of work for Master Service Agreement Standing Offer: Engineering Design Services – Electrical: New distribution line construction, Modification/ Upgrade /Rebuild of the distribution system, Repairs to distribution system, New distribution line design & staking, Emergency power system repair, Field Services: Commissioning, Site supervision and/or inspection, Equipment testing, Pole Testing Services, Cable Insulation Integrity Testing Services, Cable VLF Testing, Cable Fault Location, Underground Cable Locating, Live Line Tool Testing, Distribution System Equipment Maintenance, Demolition, teardown of Decommissioned Power Infrastructure, Inventory Counting/Organization, Emergency Response, Utility Equipment Maintenance, Site Surveying, Power Line Safety Awareness Presentations Power System Studies, Research and Studies Assessment, Harmonic Analysis, Thermographic, System Planning including generation and distribution, Distribution feeder loading analysis, Earth Resistance Testing
Alternative Energy Consulting for Power and Heat Applications: Professional advisory services, Economical and technical viability studies, Resource assessment, including data collection, survey and analysis, Green alternative energy strategies, Contract and project management of alternative energy projects, Technical and management support in principal application low- to high-temperature data analysis and interpretation, 3D modelling, surface and deep exploration for geothermal, Temperature gradient and exploration and deep geothermal production well drilling and management
Professional Advice, Research: Quality assurance/control, Environmental issues, Non-renewable resource and land management (including oil & gas development), Economic models, Load forecasts, Plant operational analysis, Power plant and/or fuel storage tank inspections and code compliance reviews, Feasibility /analysis, Design and construction cost estimating, Power Plant condition assessment
Renewable Energy projects and Battery energy projects support services Master Service Agreement Planning and Operational AES Distributed Energy, Colorado, USA USA http://www.aes.com/ 2020, 2021 Objectives/background/needs: Renewable Energy projects and Battery energy projects support services
Scope of work:
* POI screening for number of power systems for future projects. Carry out system studies to determine best locations and sizes of the power system for large Battery energy projects.
* 250MW BES, 100 MW BES, 50MW BES Collect various data from equipment vendor, AES DE project team and other associated parties for BES application filing in PJM Queue point, Review Interconnection procedure/planning criteria and other guidelines for PJM/ISO interconnection application. Prepare plant connection components modeling as per PJM/ISO application requirement for submission. Prepare applications forms and information package for formal application to PJM/ISO for feasibility, system impact and interconnection facilities study. Support, interaction and attending meeting, preparation of query(ies) reply if any during Interconnection application process. Provide support to interact with PJM/Dominion Power/TOs/Customer/Vendors. Review of PJM study reports in between and recommendation and support to AES DE for moving forward for further steps in interconnection process for system study.
300MW Rabigh solar plant interconnection impact, power quality and transient overvoltage studies Planning and Operational Saudi Electric Company Saudi Arabia
Central Southern China Electric Design institute Co. Ltd China
Saudi Arabia 2020 Grid Interconnection impact analysis, for power evacuation from 300MW Rabigh Solar PV plant to SEC transmission system/network, using design and tested plant data and latest SEC network model while meeting Saudi Arabia-Grid Code requirements. Key deliverables and solution provided: Modeled and analyzed PV solar power plant connection with the SEC grid and concluded that new connection meets the Saudi Arabia Grid Code of KSA planning criteria and TRCG. Data gathering, & modeling with SEC network model, load flow, contingencies analysis, short circuit, transient stability, PPM, LVRT, ramp rates, plant model validations, voltage and frequency deviations, voltage withstand capability, harmonics, flicker, transient over voltages, insulation coordination study, and provide recommendations. Models validation after studies again and repeat of all studies after model validation.
Rashakai Special Economic Industrial zone – Rashakai
210 MW Load connection assessment and transmission and distribution system planning
90MW steel mills connection assessment
Planning and Operational Rashakai Special Economic Industrial zone – Rashakai
Ultimate Engineering, Peshawar
Pakistan 2021 Objectives/background/needs: Review regional transmission system development plans and develop interconnection plan that meets grid code planning criteria. Key deliverables and solution provided:
Develop interconnection alternatives, model the new transmission lines, transformers, reactive power sources substations, planned load. Verify models, load flow, contingency studies, reactive power compensation studies, short circuit and stability studies to ensure grid code planning criteria is met.
90MW steel mill modeling and analysis for types of load and operating planning requirements.
System Capability Analysis for 100% renewable generation and BESS replacement with conventional generation Planning and Operational Platte River Power Authority, Colorado USA
A transmission and distribution system of voltages range of 69kV to 345kV.
USA http://www.prpa.org/ 2019, 2020 Objectives/background/needs: Platte River’s Board of Directors had approved a goal of 100% renewable generation by year 2030. Platte River wants to test its system with 100% renewable penetration for its Integrated Resource Planning (IRP). Platte River would retire all of its existing fossil generation fleet and rely on solar, wind and batteries to meet its demand. Because renewable generation is intermittent, it is possible to have extended periods of no renewable generation, requiring Platte River to import power to meet its full demand.
Carried out load-flow simulations and determine whether the Platte River system will meet planning criteria in case it has to import all the power from neighboring systems if Platte River adopts 100% renewable power generation option. Simulations carried out for summer & winter peak, assuming no Platte River renewable or battery power generation and full reliance on imported power.
Determine how much maximum renewable generation and battery storage Platter River can add to its system, without requiring any upgrades.
Determine planning level cost estimates for the required upgrades.
Generation Connection Impact studies DISIS-2016-002-1 Revised Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.org/ 2020 Generation Interconnection Impact studies for wind generation project. Power factor analysis, extensive contingencies analysis, short circuit studies, Identification & quantification of reactive power compensation. Load flow, short circuit, stability studies. Both studies as cluster of many new generation projects. Provided recommendations and conclusions regarding if new group of renewable generation is meeting the planning criteria. 53 GW coincident peak demand.
Compliance review and investigations for 12 NERC/NPCC/ISO reliability standards
North American Electric Reliability Corporation (NERC) and Northeast Power Coordinating Council (NPCC)
Planning and Operational Independent System Operator (ISO) in North America (confidential) USA 2019 2020 Objectives/background/needs: To efficiently review and conduct compliance investigations of potential breaches of NERC reliability standards in accordance with market rules & treatment of compliance Issues.
Key deliverables: Identify nature & amount of evidence required, as well as the most adequate techniques to assess compliance during an investigation; assess any potential risks to the successful completion of an investigation and devise an action plan to address these risks and mitigate their impact; collect information from market participants, to support investigations and other enforcement activities; review information collected during course of an investigation to determine relevance, and the sufficiency of the information to support investigations and other enforcement activities; assess whether the collected evidence in an investigation file demonstrates compliance or non-compliance with applicable reliability standards; conduct interviews; create investigation reports; and in the event of litigation, support the litigation team. Other services, need basis.
ISO is charged with monitoring and enforcing compliance with market rules and, as part of this mandate, conducts investigations of potential breaches of market rules and reliability standards
SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma, Texas
Generation connection assessment – 55 MW Naring Solar Power Plant, Australia Planning and Operational Clean Technology Partners, Australia, 55 MW Naring SF Solar Power Plant, Australia Australia 2019 Generation connection modeling and model validation of PSSE models. Load flow, short circuit and stability analysis.
Generation connection assessment – 40 MW Griffith SF Solar Power Plant, Australia Planning and Operational Clean Technology Partners, Australia, 40 MW Griffith SF Solar Power Plant, Australia Australia 2019 Generation connection modeling Generation connection modeling and model validation of PSSE models. Load flow, short circuit and stability analysis.
Power system analysis for technical feasibility of 12.5 MW FCCL Solar PV Power Project
Power system modeling and analysis for adding 12.5 MW solar generation in addition to local generation and supply from utility system.
Planning and Operational REON
Fauji Cement Company Ltd. Attock
Pakistan http://www.reonenergy.com/ 2019 Objectives/background/needs: The principal objective was to carry out detailed modeling and analysis of 12.5 MW Solar PV Power Plant after interconnecting with FCCL network for determination of corresponding electrical equipment loadings, voltage drops on system buses under steady state operation and short circuit levels on different buses and nodes. The impact of adding 12.5MW solar power generation was to be studied only with the corresponding operating scenario(s) of the FCCL for this power addition. Carried out power system modeling and analysis to determine whether the FCCL system will meet planning criteria in case 12.5 MW solar generation is added into the system. Detailed modeling of the present power system with all existing generators and supply from IESCO system. Carry out detailed power flow simulations with given contingencies and faults, as well as short circuit analysis. Confirm if addition of new generation will meet the given planning criteria and grid code with given generation contingencies and operating levels.
Bulk transmission plan development for regional generation additions of multiple power plants with over 7200MW capacity Planning and Operational Power Grid Corporation of Bangladesh/Consortium of PT Pertamina Power Indonesia, Marubeni Corporation Japan and Intraco CNG Limited’. Indonesia http://www.marubeni.com/ 2019 National transmission system model update year 2023 and 2025 National transmission system model update year 2023 and 2025 with new generation, new load forecast, new approved additions from approved national power plan development, alternatives development, new generation modeling, load flow, short circuit, stability, power transfer assessment, SVC/series compensation addition, system performance evaluations against grid code requirements. bulk power transmission assessment meeting grid code requirements, identification of upgrades requirements, cost comparisons, recommendations, new generation connections scope development
Power System Study of 1292 MW HUBCO (existing) for the assessment of extent of generation curtailment due to transmission constraints, National Transmission & Despatch Company (NTDC) Planning and Operational HUBCO & Engineers Guild (Pvt.) Ltd Pakistan 2018 Objectives/background/needs: HUBCO 1292MW power plant generation dispatch and monthly load factors are expected to be impacted due to newly added renewable generation plants and coal fired power plants connecting to the NTDC 500kV network in Sindh Province region. Key deliverables and solution provided:
POWER-tek assessed the extent of Hubco plant generation curtailment for transmission constraints/congestion due to newly added plants in the Sindh region, and the corresponding impact on the monthly load factors for the plant in the next few years to 2025. Provided solutions and options to address the needs.
Generation Connection Impact studies
1. DISIS-2011-001 Grp 9
2. DISIS-2012-001 Grp 14
3. DISIS-2012-002 Grp 7
4. DISIS-2013-001 Grp 3
5. GEN-2011-027-Restudy
6. Gen-2009-040-Restudy
7. DISIS-2013-002 Grp 1
8. DISIS-2014-001 Grp 9
9. DISIS-2014-002 Grp 2,8
10. DISIS-2015-1-Grp 4, 13
11. DISIS-2015-2-Gp 4, 14
12. DISIS-2016-1 Grp 12, 13
13. DISIS-2016-1 Grp 12, 13
14. DISIS-2016-2Grp 4, 13,
Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.org/ 2011, 2012, 2013, 2014, 2015, 2016, 2017, 2018
2019, 2020, 2021
Ongoing
Over 295 renewable generation connection assessment studies successfully completed. Renewable Generation Interconnection Impact studies for wind and solar generation project. Power factor analysis, extensive contingencies analysis, short circuit studies, Identification & quantification of reactive power compensation. Load flow, short circuit, stability studies. Both studies as cluster of and stand-alone studies of many new generation projects. Provided recommendations and conclusions regarding if new group of renewable generation is meeting the planning criteria. 53 GW coincident peak demand. SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma, Texas
Renewable generation Interconnection impact, power quality and transient overvoltage studies of 10 MWac Layla PV Solar Plant Planning and Operational Saudi Electric Company Saudi Arabia Saudi Arabia 2018 Objectives/background/needs:Grid Interconnection impact analysis, for power evacuation from Lyla Solar PV plant to SEC transmission system/network, using design and tested plant data and latest SEC network model while meeting Saudi Arabia-Grid Code requirements.
Key deliverables and solution provided: Modeled and analyzed PV solar power plant connection with the SEC grid and concluded that new connection meets the Saudi Arabia Grid Code of KSA planning criteria and TRCG. Data gathering, & modeling with SEC network model, load flow, contingencies analysis, short circuit, transient stability, LVRT, voltage and frequency deviations, voltage withstand capability, harmonics, flicker, transient over voltages, insulation coordination study, and provide recommendations.
Generation Connection Impact studies DISIS-2016-002- Group 4 Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.org/ 2018 Generation Interconnection Impact studies for wind generation project. Power factor analysis, extensive contingencies analysis, short circuit studies, Identification & quantification of reactive power compensation. Load flow, short circuit, stability studies. Both studies as cluster of many new generation projects. Provided recommendations and conclusions regarding if new group of renewable generation is meeting the planning criteria. SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma, Texas
Generation Connection Impact studies DISIS-2016-002- Group 13 Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.org/ 2018 Generation Interconnection Impact studies for wind generation project. Power factor analysis, extensive contingencies analysis, short circuit studies, Identification & quantification of reactive power compensation. Load flow, short circuit, stability studies. Both studies as cluster of many new generation projects. Provided recommendations and conclusions regarding if new group of renewable generation is meeting the planning criteria. 53 GW coincident peak demand. SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma, Texas
Generation Connection Impact studies DISIS-2016-002- Group 16 Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.org/ 2018 Generation Interconnection Impact studies for wind generation project. Power factor analysis, extensive contingencies analysis, short circuit studies, Identification & quantification of reactive power compensation. Load flow, short circuit, stability studies. Both studies as cluster of many new generation projects. Provided recommendations and conclusions regarding if new group of renewable generation is meeting the planning criteria. 53 GW coincident peak demand. SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma, Texas
Dasu hydropower plants 12860 MW interconnection development and assessment of HVDC transmission Planning and Operational National Transmission & Despatch Company (NTDC), Pakistan Pakistan http://www.ntdc.com.pk/ 2017 Objectives/background/needs: NTDC system planning to year 2030 required extensive transmission expansion to bring about 30,000 MW power from northern hydro plants. One of the transmission corridors had certain Right of Way and terrain difficulties. In order to transmit 12861 MW through this Dasu corridor, NTDC had reviewed 765 and 500kV options of transmission voltage level for given power transfer levels. NTDC further wanted to evaluate HVDC transmission options as well and then compare with other 765kV and 500kV options. NTDC wanted to evaluate techno-economical study for year 2020, 2022, 2025 and 2030 to see which option is most suited for this required power transfer. Key deliverables and solution provided: Prepared HVDC options schemes, ranking of three options based on transmission lines life time techno-economic studies. Power transfer enhancement studies using FACTS application including series compensation and SVCs. Detailed power system studies, load flow, short circuit, stability and economic studies to rank the alternatives, recommendations, reporting. NTDC hired POWER-tek staff augumentation/directly through Word Bank procurement procedures
Grid absorption study of solar plants for the great Banjul area, Gambia, West Africa Planning and Operational AF-Mercados EMI, Spain Spain http://www.afconsult.com/ 2017 Objectives/background/needs: key objectives and purpose of this project is to enabling the framework to increase renewable (solar) electricity generation by assess the capacity of the network to absorb solar energy. By considering the renewable targets to be used, a certain percentage of electricity demand to be met from renewable sources, and allows the model to select the least cost option from the renewable sources available. Banjul area system planning up to year 2025 required extensive transmission and sub-transmission expansion to bring about 50 MW power from Solar plants.
Key deliverables and solution provided: Prepared different spot years 2017, 2018, 2019, 2020 and 2025 models/ schemes with incremental addition of 10MW of solar power up to 50MW. Power transfer enhancement studies using series and shunt compensation and SVCs. Detailed power system studies, load flow, short circuit, stability and economic studies to rank the alternatives, recommendations, reporting.
Grid interconnection studies of 50 MW Kolachi Solar PV Power Plant Planning and Operational Target Energy Ltd
South Africa/
Haigler Baily Ltd.
Pakistan 2017 Modeled and analyzed power plant grid connection with the PESCO/NTDC grid and concluded that new connection meets the NEPRA Grid Code planning criteria. Site survey, data gathering, & modeling with NTDC network model, load flow, short circuit, power quality (harmonics and filters) stability, recommendations.
Preparation of Regional Transmission Grid Plan For Gilgit Baltistan (GB) Area Planning and Operational National Transmission & Despatch Company (NTDC), Pakistan Pakistan http://www.ntdc.com.pk/ 2017 Objectives/background/needs: Establishment of regional transmission grid plan in Gilgit – Baltistan (GB) area, Pakistan is a project planned to connect the GB region with National Grid system of Pakistan. The project caters power demand for next two decades to year 2035 in ten districts of GB by interconnecting each other through proposed regional transmission grid plan. GB area has very high hydro power generation potential and there are number of new hydro plants of overall 4200 MW were planned. Presently GB area grid of 140 MW capacity is operating in many islands and is not connected to the national grid of NTDC. There was need of assembling the data and model the present grid system and plan the interconnection with the NTDC along with new incoming new large hydro plants. Key deliverables and solution provided: Developed transmission planning criteria, Prepared and reviewed provided load forecast and generation development plans, Selection of voltage level(s) for regional transmission interconnections and with national grid for proposed development plans, Identified generation interconnection transmission schemes (alternatives and options) for the proposed Hydro Power Projects, Performed necessary power flow, short circuit and transient stability assessment studies and provided a high level assessment of the potential interconnection between the GB regional grid and the NTDC transmission system keeping in view the future HPPs projects in northern part of Pakistan. Future years of planned 2021, 2025 and 2035 interconnected grid system of about 94000 MW load was prepared and report was submitted.
Grid system impact study of
330 MW Thar Mine Mouth Coal Power Plant
Thar Block-II, District Tharparkar
Planning and Operational Siddiqsons Pakistan http://www.thesiddiqsonsgroup.com/ 2017 Modeled and analyzed power plant grid connection with the NTDC grid and concluded that new connection meets the NEPRA Grid Code planning criteria. Short circuit, stability, recommendations.
Grid System Impact Studies of 1223 MW Balloki Natural gas fired power plant , District Kasur Planning and Operational National Power Park Management Company Ltd. NESPAK Pakistan http://www.nespak.com.pk/ 2017 Project Challenges: The principal objective was to assess the impact of the suggested interconnection for the ‘1223 MW combined cycle power plant Balloki’ on the NTDC transmission system and vice versa.
Following were the challenges associated with this project:
* Highly dense demand area.
* Transmission constraints
* High short circuit ratings in nearby grid stations
The following studies/activities and tests/analysis were required to be carried out in order to check the robustness of combined cycle power plant and the interconnection strategy of the desired system.
1. Load flow analysis.
2. Short circuit analysis.
3. Transient stability analysis.
Solutions Successfully Delivered:
· Modeled and Analyzed power plant grid connection with the NTDC grid
· Performed Load Flow, Short Circuit and Stability Analysis
· Concluded that new connection meets the NEPRA Grid Code planning criteria.
· POWER-tek provided tackled all the challenges and provided solutions for all problems related to transmission, stability and loading issues.
· Despite tight timelines, POWER-tek’s prompt and responsive team completed assigned tasks in time and submitted report after entertaining all the queries and played big role in the commissioning of power plant.
Grid system impact studies of 1230 MW Haveli Bahadur Shah, Natural gas fired power plant, District Jhang Planning and Operational National Power Park Management Company Ltd Pakistan http://www.nespak.com.pk/ 2017 Project Challenges: The principal objective was to assess the impact of the suggested interconnection for the ‘1230 MW combined cycle power plant Haveli Bahadur Shah’ on the NTDC transmission system and vice versa. Following were the challenges associated with this project:
* Highly dense demand area.
* Transmission constraints
* High short circuit ratings in nearby grid stations
The following studies/activities and tests/analysis were required to be carried out in order to check the robustness of combined cycle power plant and the interconnection strategy of the desired system.
1. Load flow analysis.
2. Short circuit analysis.
3. Transient stability analysis.
Solutions Successfully Delivered:
· Modeled and Analyzed power plant grid connection with the NTDC grid
· Performed Load Flow, Short Circuit and Stability Analysis
· Concluded that new connection meets the NEPRA Grid Code planning criteria.
· POWER-tek provided tackled all the challenges and provided solutions for all problems related to transmission, stability and loading issues.
· Despite tight timelines, POWER-tek’s prompt and responsive team completed assigned tasks in time and submitted report after entertaining all the queries and played big role in the commissioning of power plant.
Generation Interconnection Impact studies Planning and Operational PJM Interconnections LLC, USA USA http://www.pjm.com/ 2017 Generation Interconnection Impact studies for a large number of generation requests. Load flow, extensive stability studies, studies automation, extensive modeling and analysis trouble shooting, Identification and quantification of reactive power compensation, SVC applications, HVDC assessments, stabilizer parameters fixing to damp oscillations, identification of reinforcement requirements. QA, reports.
1. AB2-028, Fall Creek-Desoto 345kV, 200 MW, 200 MWE, wind, AEP
2. AB2-041, Frostburg 138kV (IV), 3.7 MW, 20 MWE, wind, APS
3. S-071, Bluff Point, Indiana, 120 MW, wind, AEP
Largest power pool of in North America, Dispatches about 180,400 MW of generating capacity over 61,200 miles of transmission lines. Coordinates movement of wholesale electricity in Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, and West Virginia & Dist. of Columbia.
Power system planning studies (2017-AB2 series projects) Planning and Operational First Energy Corp
ATSI
American Transmission System Ins.
PENELEC
PECO
Dayton P & Light Co
UGI Corporation
PPL Electric Utilities
USA http://www.ugicorp.com
JerseyCentralPowerLight
pplelectric.com
/
2017 Site survey, data gathering, & modeling with NTDC network model, load flow, short circuit, stability and power quality (harmonics and filters) studies, recommendations. Site survey, data gathering, & modeling
Grid System Impact Studies of 545 MW Kaigah Hydro Power plant Planning and Operational Associated Technologies Group, Lahore Pakistan 2017 Modeled and analyzed power plant grid connection with the NTDC grid and concluded that new connection meets the NEPRA Grid Code planning criteria. Site survey, data gathering, & modeling with NTDC network model, load flow, short circuit, power quality stability, recommendations.
Grid System Impact Studies of Hydro Power plant SAR Energy Planning and Operational SAR Energy Pvt. Ltd. Pakistan 2017 Modeled and analyzed power plant grid connection with the NTDC grid and concluded that new connection meets the NEPRA Grid Code planning criteria. Site survey, data gathering, & modeling with NTDC network model, load flow, short circuit, power quality (harmonics and filters) stability, recommendations.
Grid interconnection studies of 50MW Siddiqsons Kohat solar PV power plant (Kohat plant) Planning and Operational Dubai, UAE UAE http://www.access-power.com/ 2017 Modeled and analyzed power plant grid connection with the NTDC grid and concluded that new connection meets the NEPRA Grid Code planning criteria. Site survey, data gathering, & modeling with NTDC network model, load flow, short circuit, power quality (harmonics and filters) stability, recommendations.
Generation Connection Impact studies DISIS-2016-001- Group 12 Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.org/ 2016 Generation Interconnection Impact studies for wind generation project. Power factor analysis, extensive contingencies analysis, short circuit studies, Identification & quantification of reactive power compensation. Load flow, short circuit, stability studies. Both studies as cluster of many new generation projects. Provided recommendations and conclusions regarding if new group of renewable generation is meeting the planning criteria. 53 GW coincident peak demand. SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma, Texas
Generation Connection Impact studies DISIS-2016-001- Group 13 Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.org/ 2016 Generation Interconnection Impact studies for wind generation project. Power factor analysis, extensive contingencies analysis, short circuit studies, Identification & quantification of reactive power compensation. Load flow, short circuit, stability studies. Both studies as cluster of many new generation projects. Provided recommendations and conclusions regarding if new group of renewable generation is meeting the planning criteria. 53 GW coincident peak demand. SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma, Texas
Electrical network study of 200MW combined cycle power plant Planning and Operational Fauji Kabirwala Power Company Ltd. FKPCL (157MW) Pakistan http://www.faujipower.com/ 2016 Objectives/background/needs: Commissioned in early nineties, FKPCL wanted to add the capacity of 50MW and expand the plant capacity to 200MW. Expansion size and parameters quantification required in view of limited grid capacity at the give location was challenge to meet grid code requirements. Key deliverables and solution provided: Modeled and analyzed power plant grid connection with the addition of 50MW machine in already connected 150MW plant with NTDC grid and concluded that new connection meets the NEPRA Grid Code planning criteria. Create ways to bring the parameters to the required limits were used. Site survey, data gathering, & modeling with NTDC/MEPCO network model and update MEPCO grid model, load flow, short circuit, stability, recommendations.
Grid interconnection studies of 50MW Nowshera Siddiqsons solar PV power plant (Nowshera Plant) Planning and Operational Dubai, UAE UAE http://www.access-power.com/ 2016 Modeled and analyzed power plant grid connection with the NTDC grid and concluded that new connection meets the NEPRA Grid Code planning criteria. Site survey, data gathering, & modeling with NTDC network model, load flow, short circuit, power quality stability, recommendations.
Generation Interconnection Impact studies Power system planning studies
(2016-AB1 series projects)
Planning and Operational USA http://www.pjm.com
ugicorp.com
pplelectric.com
JerseyCentralPowerLight/
2016 Generation Interconnection Impact studies for a large number of generation requests. Load flow, extensive stability studies, studies automation, extensive modeling and analysis trouble shooting, Identification and quantification of reactive power compensation, SVC applications, HVDC assessments, stabilizer parameters fixing to damp oscillations, identification of reinforcement requirements. QA, reports.
1. AB1-068, Eldred-Frackville 230kV, 364 MW, Natural gas, PPL
2. AB1-084, Greenfield-Elk Mountain 69kV, 19.9 MW, Natural gas, PPL
3. AB1-092, Moshannon-East Towanda 230kV, 504, Natural gas, PENELEC
4. AB1-108, Lackawanna-Paupack 230kV, 485MW, Natural gas, PPL
5. AB1-154, Gilbert 230kV, 1092.2 MW, Natural gas, JCPL
6. AB1-182, Bear Creek, 20 MW, Storage, PPL Largest power pool of in North America, Dispatches about 180,400 MW of generating capacity over 61,200 miles of transmission lines. Coordinates movement of wholesale electricity in Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, and West Virginia & Dist. of Columbia.
Generation Connection Impact studies PISIS-2015-002- Group 17 200.6MW GE 1.7MW wind turbines Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.org/ 2016 Generation Interconnection Impact studies for wind generation project. Power factor analysis, extensive contingencies analysis, short circuit studies, Identification & quantification of reactive power compensation. Load flow, short circuit, stability studies. Both studies as cluster of many new generation projects. Provided recommendations and conclusions regarding if new group of renewable generation is meeting the planning criteria. 53 GW coincident peak demand. SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma, Texas
Generation Interconnection Impact studies
Power system planning studies
(2015-16-AA2 series projects)
Planning and Operational PJM Interconnections LLC, USA
First Energy Corp
American Transmission System Ins.
PENELEC
PECO
Dayton P & Light Co
UGI Corporation
PPL Electric Utilities
USA http://www.pjm.com/ 2016 Generation Interconnection Impact studies for a large number of generation requests. Load flow, extensive stability studies, studies automation, extensive modeling and analysis trouble shooting, Identification and quantification of reactive power compensation, SVC applications, HVDC assessments, stabilizer parameters fixing to damp oscillations, identification of reinforcement requirements. QA, reports.
1. AA2-008, Sagers 230kV, 907 MW, Natural gas, PA, PPL
2. AA2-017, East Palmerton-Acahela 69kV, 98 MW, Wind, PA, PPL
3. AA2-128, Raritan River-Werner 115kV, 175 MW, Natural gas, NJ, JCPL
4. AA2-170, Burches Hill-Brandywine 230kV, 1038.1, Natural gas, MD, PEPCO
5. AA2-171, Sunbury 500kV, 1121MW, Natural gas, PA, PPL
6. AA2-182, Sunbury 500kV, 1030, Natural gas, PA, PPL
2.6 MW Machai Hydro Power Plant – connection assessment study Planning and Operational PEDO, Pakhtunkhwa Energy Development Organization through – Alfajar& Shaheen JV. www.alfajar.com.pk Pakistan http://www.pedo.pk/ 2015, 2016 Modeled and analyzed power plant grid connection with the PESCO grid and concluded that new connection meets the NEPRA Grid Code planning criteria. Site survey, data gathering, & modeling with PESCO network model, load flow, short circuit, stability, recommendations.
System Impact Studies of 5400MW hydro plant including overall 12861 MW hydro power plants, 765kV power transmission, and rank the alternatives of 765kV or 500kV power transmission Planning and Operational Korea Electric Power Company (KEPCO) Pakistan http://www.kepco.co.kr/ 2015, 2016 Objectives/background/needs: NTDC system planning to year 2030 required extensive transmission expansion to bring about 30,000 MW power from northern hydro plants. One of the transmission corridors had certain Right of Way and terrain difficulties. In order to transmit 12861 MW through this corridor, NTDC wanted to review transmission voltage level for given power transfer levels and see if power transfer can be increased for both alternatives of 765kV or 500kV level transmission. NTDC wanted to evaluate techno-economical study for year 2020, 2021, 2022, 2025 and 2030 to see which voltage level is most suited for this required power transfer. Key deliverables and solution provided: Ranking of alternatives based on transmission lines life time techno-economic studies. Detailed power system studies, load flow, short circuit, stability and economic studies to rank the alternatives. Power transfer enhancement studies using FACTS application including series compensation and SVCs. Recommendations and report. Presentation to top management.
Generation Connection Impact studies
DISIS-2015-002- Group 4
200MW GE, and 197.8MW Siemens, 202.4MW Siemens, 20.9 GE WTGs
Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.org/ 2015, 2016 Generation Interconnection Impact studies for wind generation project. Power factor analysis, extensive contingencies analysis, short circuit studies, Identification & quantification of reactive power compensation. Load flow, short circuit, stability studies. Both studies as cluster of many new generation projects. Provided recommendations and conclusions regarding if new group of renewable generation is meeting the planning criteria. 53 GW coincident peak demand. SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma, Texas
Generation Connection Impact studies
DISIS-2015-002- Group 14
9.0MW Eaton Expert Solar, 303.6MW Siemens WTG, 20.0MW Parker 890GT-B2MW inverters (battery storage) , 250 GE WTGs
Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.org/ 2015, 2016 Generation Interconnection Impact studies for wind generation project. Power factor analysis, extensive contingencies analysis, short circuit studies, Identification & quantification of reactive power compensation. Load flow, short circuit, stability studies. Both studies as cluster of many new generation projects. Provided recommendations and conclusions regarding if new group of renewable generation is meeting the planning criteria. 53 GW coincident peak demand. SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma, Texas
Generation connection impact studies for 5o MW Solar Hybrid –Battery storage Planning and Operational Atlantis Raiwind Ltd USA 2015, 2016 Modeled and analyzed power plant grid connection with the NTDC grid and concluded that new connection meets the NEPRA Grid Code planning criteria. Site survey, data gathering, & modeling with NTDC network model, load flow, short circuit, stability and power quality (harmonics and filters) studies, recommendations.
Grid connection impact assessment, 50-200 MW Solar PV Power plant Planning and Operational Fotowatio Renewable Ventures (FRV) FRV Services Middle East DMCC, Dubai UAE UAE http://www.frv.com/ 2015, 2016 Modeled and analyzed power plant grid connection with the K-Electric-NTDC grid and concluded that new connection meets the NEPRA Grid Code planning criteria. Site survey, data gathering, & modeling with K-Electric-NTDC network model, load flow, short circuit, stability and power quality (harmonics and filters) studies, recommendations.
18 MW Dhaddar Hydro Power Plant – connection assessment study Planning and Operational Mirza Associates (pvt) Ltd. Pakistan http://www.maes.com.pk/ 2015, 2016 Modeled and analyzed power plant grid connection with the NTDC grid and concluded that new connection meets the NEPRA Grid Code planning criteria. Site survey, data gathering, & modeling with NTDC network model, load flow, short circuit, stability, recommendations.
Grid connection impact assessment studies, 28 MW Summar Gah hydro Planning and Operational GREEN SURE E.S. Islamabad Pakistan http://www.greensure.org/ 2015 PESCO/NTDC grid connection impact studies as per NEPRA, planning criteria. Site survey, data gathering, and modeling, with NTDC network model, Load flow, short circuit, stability and power quality (harmonics and filters) studies, recommendations.
Grid connection impact assessment studies, 12 MW Greensure Waste to Energy plant Mardan Planning and Operational GREEN SURE E.S. www.greensure.org Islamabad Pakistan http://www.greensure.org/ 2015 PESCO/NTDC grid connection impact studies as per NEPRA, planning criteria. Site survey, data gathering, and modeling, with NTDC network model, Load flow, short circuit, stability and power quality (harmonics and filters) studies, recommendations.
Generation Interconnection Impact studies Power system planning studies (2015-16-AA1 series projects) Planning and Operational PJM Interconnections LLC, USA USA http://www.pjm.com/ 2015 Generation Interconnection Impact studies for a large number of generation requests. Load flow, extensive stability studies, studies automation, extensive modeling and analysis trouble shooting, Identification and quantification of reactive power compensation, SVC applications, HVDC assessments, stabilizer parameters fixing to damp oscillations, identification of reinforcement requirements. QA, reports. 1. Hay Road 230kV, 371MW, Natural Gas power generation plant for DPL 2. Peach Bottom 500kV, 880 MW, Natural Gas power generation plant for PECO 3. Mountain 230kV, 180 MW Natural Gas power generation plant for UGI 4. Shenango-Hoytdale 345kV, 1000 MW Natural Gas power generation plant for ATSI 5. Guilford 138kV, 400 MW, Natural Gas power generation plant for PENELEC 6. Somerset-Allegheny 115kV, 80 MW Wind power generation plant for PENELEC 7. Bay Shore-Fostoria 345kV & Bay Shore-Monroe 345kV, 960 Natural Gas power generation plant for ATSI 8. Susquehanna-Lackawanna 500kV, 1050 MW, Natural Gas power generation plant for PPL 9. Hunterstown-Conemaugh 500kV, 1050 MW, Natural Gas power generation plant for PENELEC 10. Lackawanna 230kV, 1483 MW, Natural Gas power generation plant for PPL 11. Emilie 230kV, 1342 MW, Natural Gas power generation plant for PECO 12. E. Towanda 230kV, 925MW, Natural Gas power generation plant for PENELEC 13. Raritan River-Red Oak 230kV, 1010 MW, Natural Gas power generation plant for JCPL 14. East Palmerton-Harwood 230kV, 213 MW Wind power generation plant for PPL 15. Moshannon-East Towanda 230kV, 463 MW, Natural Gas power generation plant for PENELEC 16. East Hazelton-Harwood 69kV, 68 MW Wind power generation plant for PPL 17. Highland-Sammis 345kV, 1152MW, Natural Gas power generation plant for ATSI 18. East Towanda-Grover 230kV, 163 MW, Natural Gas power generation plant for PENELEC Largest power pool of in North America, Dispatches about 180,400 MW of generating capacity over 61,200 miles of transmission lines. Coordinates movement of wholesale electricity in Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, and West Virginia & Dist. of Columbia. Transmission Owners System worked on: First Energy Corp ATSI American Transmission System Ins. PENELEC PECO Dayton P & Light Co UGI Corporation http://www.ugicorp.com/ PPL Electric Utilities www.pplelectric.com Jersey Central Power/ Light Co
Power system planning and Grid Compliance Study of Napier Wind Farm Planning and Operational Tetra-Tech WEI Inc. Mississauga, Canada For Wpd Canada Corporation Tetra Tech WEI Inc. 6835A Century Avenue | Mississauga, ON L5N 7K2 | Canada | www.tetratech.com Germany Germany http://www.tetratech.com/ 2015 Objectives/background/needs: Regional distribution system planning for Hydro One Networks Inc including new renewable generation planning and power quality (harmonics and filters) studies. Wind farm and Hydro One distribution system model development. Key deliverables and solution provided: Load flow analysis for different scenarios (nominal, max. and min. voltage for different wind farm power outputs,0% to 100%, at the required power factor setting). Equipment sizing calculations, Cable sizing calculations for 27.6 kV collector system, Assessment of the voltage fluctuations (i.e. upon start up and shut down of the turbines). Reactive power analysis of the entire distributions system and wind farm in order to identify the need of a reactor/capacitor bank or other power electronic devices in order to fulfill Hydro One´s power factor requirements and less estimation. Preparation of dynamic model of the wind farm, Dynamic analysis of the system. Analysis of temporary overvoltage issues in the wind farm. Short circuit analysis, Harmonic and Flicker analysis in order to identify possible risks of the wind farm not meeting the grid code requirements. Extensive use of distributions system analysis software.
Grid connection impact assessment studies, 20 MW Solar PV Power plant Planning and Operational Benazirabad Solar Power (SMC-PVT.) Ltd Sponsors: ZTE Corporation China Through Project Consultants: ME Consultants Pakistan 2015 Modeled and analyzed power plant grid connection with the NTDC grid and concluded that new connection meets the NEPRA Grid Code planning criteria. Site survey, data gathering, & modeling with NTDC network model, load flow, short circuit, stability and power quality (harmonics and filters) studies, recommendations. Site survey, data gathering, & modeling with NTDC network model, load flow, short circuit, stability and power quality (harmonics and filters) studies, recommendations.
Grid connection impact assessment studies, 2.4 Hydro Power plant Planning and Operational Frontier Mega Structures & Power (pvt) Ltd Pakistan http://www.ghanoolhpp.com/ 2015 Modeled and analyzed power plant grid connection with the NTDC grid and concluded that new connection meets the NEPRA Grid Code planning criteria. Site survey, data gathering, & modeling with NTDC network model, load flow, short circuit, stability, recommendations.
Generation Connection Impact studies DISIS-2015-001- Group 4 · 70 MW Nordex 2.5 MW WTGs · 155 Summer/172 winter Natural Gas power generation. Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.org/ 2015 Generation Interconnection Impact studies for wind generation project. Power factor analysis, extensive contingencies analysis, short circuit studies, Identification & quantification of reactive power compensation. Load flow, short circuit, stability studies. Both studies as cluster of many new generation projects as well as standalone studies. Provided recommendations and conclusions regarding if new group of renewable generation is meeting the planning criteria. 53 GW coincident peak demand. SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma, Texas
Generation Connection Impact studies DISIS-2015-001- Group 13 200.1MW GE 1.79 and GE 2.0 MW WTGs NEBRASKA Public Power Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.orgnppd.com/ 2015 Generation Interconnection Impact studies for wind generation project. Power factor analysis, extensive contingencies analysis, short circuit studies, Identification & quantification of reactive power compensation. Load flow, short circuit, stability studies. Both studies as cluster of many new generation projects. Provided recommendations and conclusions regarding if new group of renewable generation is meeting the planning criteria. 53 GW coincident peak demand. SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma, Texas
Grid connection assessment of 45 MW wind power generation plant to National Grid System of Jordan Planning and Operational Hecate Energy LLC, Nashville, TN USA for Kingdom Electricity Company (KEC) Jordan USA 2014 Generation Interconnection Impact studies for 45MW wind generation project. Power factor analysis, extensive contingencies analysis, short circuit studies, Load flow, short circuit, stability studies. Provided recommendations and conclusions regarding if new group of renewable generation is meeting the planning criteria.
Generation Connection Impact studies DISIS-2014-002- Group 2 Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.org/ 2014 Generation Interconnection Impact studies for wind generation project. Power factor analysis, extensive contingencies analysis, short circuit studies, Identification & quantification of reactive power compensation. Load flow, short circuit, stability studies. Both studies as cluster of many new generation projects as well as standalone studies. Provided recommendations and conclusions regarding if new group of renewable generation is meeting the planning criteria. 53 GW coincident peak demand. SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma, Texas
Generation Connection Impact studies DISIS-2014-002- Group 8 Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.org/ 2014 Generation Interconnection Impact studies for wind generation project. Power factor analysis, extensive contingencies analysis, short circuit studies, Identification & quantification of reactive power compensation. Load flow, short circuit, stability studies. Both studies as cluster of many new generation projects as well as standalone studies. Provided recommendations and conclusions regarding if new group of renewable generation is meeting the planning criteria. SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma, Texas 53 GW coincident peak demand.
Review different connection options to sell energy to multiple customers, including wheeling 18 MW Pehur Hydro Power plant PAKHTUNKHWA ENERGY DEVELOPMENT ORGANIZATION (PEDO) Planning and Operational Pehur Hydro Power Project Gadoon Amazai Industrial Area, Khyber Pakhtunkhwa Pakistan 2014 Objectives/background/needs: Pehur hydro plant wanted to evaluate the possibility of selling energy to multiple or a single bulk power purchaser in Gadoon Amazai Industrial Area by developing new direct connection or through a Wheeling Agreement with the grid company. Key deliverables and solution provided: POWER-tek reviewed existing 132kV connection with the grid, proposed new direct connection options to Gadoon Amazai industrial area and compared with existing connection based on wheeling model. Developed, modeled, analyzed and compared connection alternatives by detailed load flow, short circuit and transient stability studies. Prepared recommendation, bill of quantities and cost estimates.
Generation Connection Impact studies NEBRASKA Public Power Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.orgnppd.com/ 2014 SPP-DISIS-2014-001 – Group-9 — Generation Interconnection Impact studies for wind generation project. Power factor analysis, Identification & quantification of reactive power compensation, SVC applications. Load flow, stability studies. 53 GW coincident peak demand. SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma, Texas
Grid connection impact assessment studies for 30 MW solar power plant in Quaid-e-Azam Solar Power Park Cholistan Planning and Operational Associated Technologies Group, Lahore Pakistan 2014 NTDC grid connection impact studies as per NEPRA planning criteria. Site survey, data gathering, & modeling with NTDC network model, Load flow, short circuit, stability and power quality (harmonics and filters) studies, recommendations.
Transmission connection planning for FURSAN ISLAND with Saudi Electricity System Planning and Operational A. S. Azzouni Consultants, Dahran Kingdom of Saudi Arabia. for Saudi Electricity Company, Kingdom of Saudi Arabia Saudi Arabia http://www.asazzouni.com / 2014 Objectives/background/needs: SEC was evaluating to connect the Fursan island to the national grid. Number of options was required to be studies and recommended. Key deliverables and solution provided: Technical analysis and review of 4 planning options for transmission connection of Fursan Island system, including HVDC lines. Transmission system losses estimation. Review technical & economic analysis, comments, report.
Grid connection impact assessment studies for 50 MW solar power plant Planning and Operational Integrated Power Solutions (IPS), Novi, Michigan USA (AEDB LOI #) IPS – B/3/2/SPV/LOI-022 USA http://www.ipsfzc.com/ 2014 NTDC grid connection impact studies as per NEPRA planning criteria. Site survey, data gathering, & modeling with NTDC network model, Load flow, short circuit, stability and power quality (harmonics and filters) studies, recommendations.
Grid connection impact assessment studies for 50 MW solar power plant Planning and Operational Solar Blue (AEDB LOI #) SB- B/3/2/SPV/LOI-024 M/s Solar Blue Pvt. Ltd. 50, Nooriabad, Sindh Pakistan 2014 NTDC grid connection impact studies as per NEPRA planning criteria. Site survey, data gathering, & modeling with NTDC network model, Load flow, short circuit, stability and power quality (harmonics and filters) studies, recommendations.
Grid connection impact assessment studies for 50 MW solar power plant Planning and Operational Jafri and Associates (JA) AEDB LOI #) JA – B/3/2/SPV/LOI-023 Pakistan http://www.jafriandassociates.com/ 2014 NTDC grid connection impact studies as per NEPRA planning criteria. Site survey, data gathering, & modeling with NTDC network model, Load flow, short circuit, stability and power quality studies, recommendations.
Specialized services resource pool Power systems analysis Planning and Operational Independent Electricity System Operator (IESO) Ontario Canada Canada http://www.ieso.ca/ 2014, 2015, 2016, 2017, 2018, 2019 Objectives/background/needs: IESO required experts pool and support on projects of need basis. POWER-tek qualified as providing of such services to IESO as and when needed. Key deliverables and solution provided: Bulk power system reliability criteria and the IESO-administered market rules, Assessing long-term and short term transmission plans, Feasibility studies and system impact assessments for new or modified facilities, Developing and updating analytical study techniques to solve power system problems for power system operation, standards and practices, and market operations, Power system simulations and technical analysis of the performance of control systems, new or modified system facilities, grid. Manages Ontario’s about 27000MW peak load, power system and operating the wholesale market.
Generation Interconnection Impact studies Power system planning studies Planning and Operational PJM Interconnections LLC, USA www.pjm.com Transmission Owners System worked on: First Energy Corp ATSI – American Transmission System Inc. Metropolitan Edison Company (ME) PENELEC PECO Dayton P & Light Co PPL Electric Utilities www.pplelectric.com Jersey Central Power/ Light Co USA http://www.pjm.compplelectric.com/ 2014 Generation Interconnection Impact studies for a large number of generation requests. Load flow, extensive stability studies, studies automation, extensive modeling and analysis trouble shooting, Identification and quantification of reactive power compensation, SVC applications, HVDC assessments, stabilizer parameters fixing to damp oscillations, identification of reinforcement requirements. QA, reports. 1. East Hazelton-Harwood 69kV, 67.5 MW, wind power generation plant for PPL 2. Highland – Sammis 345kV & Highland – Mansfield 345kV, 800 MW, Natural Gas power generation plant for ATSI 3. Susquehanna-Lackawanna 500kV, 1050 MW, Natural Gas power generation plant for PPL 4. Winfall – Mackeys 230 kV, 300.3 MW, wind power generation plant for Dominion 5. Burches Hill – Brandywine 230 kV, 927 MW, combined cycle plant for PEPCO 6. North Temple 230 KV, 800 MW, Natural Gas power generation plant for First Energy Metropolitan Edison Company (ME) 7. Stuart 4MW, 20.5 uprate to 577MW coal power generation plant for Dayton Power 8. Frackville – Fishbach 69kV, 68 MW, wind power generation plant for PPL 9. NYISO – South Ripley 230kV, 83.4 MW combined cycle plant for NYISO –Penelec.
Specialized services resource pool Assistance and support as Short Term operations planning, Real-Time control room operations Planning and Operational Independent Electricity System Operator (IESO) Ontario Canada www.ieso.ca Manages Ontario’s about 27000MW peak load, power system and operating the wholesale market. Canada 2014, 2015, 2016, 2017, 2018, 2019 Objectives/background/needs: IESO required experts pool and support on projects of need basis. POWER-tek qualified as providing of such services to IESO as and when needed. Key deliverables and solution provided: Developing power system outage and resource plans, Use of system models, security analysis tools, and study systems such as dispatch power flow studies for evaluating system outage and resource plans, Maintaining & production of system limits for real time operations, Application of NERC reliability standards & NPCC regional criteria, directories, & guidelines regarding operations planning, & real-time operations timeframes, -Developing real-time operational processes & procedures for grid operations, Real-time operational processes & procedures for market operations, Technical support in SCADA systems & operational limit programs for the purposes of monitoring & maintaining interconnected & local operating security limits, Developing System Control Order & Facility Description Documents for grid operations.
Generation Connection Impact studies Midwest Energy Inc. Hays, Kansas, Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.orgmwenergy.com/ 2013 SPP-DISIS-2013-001–Grp 3 – Midwest Energy Inc. Generation Interconnection Impact studies for wind generation project. Power factor analysis, Identification & quantification of reactive power compensation, SVC applications. Contingencies, load flow, stability studies. 53 GW coincident peak demand.
Smart Grid Fund
Primary project: Load Aggregation & Control Projects
Secondary projects:
§ Smart Meter Cyber-security
§ Commercial Customer Energy Management
§ Research/Development Centre
§ Smart Grid Community
§ Smart Grid Application Platform for Distributed Intelligence
§ Distribution Monitoring/Control
§ Smart Grid Power Technologies
§ Advanced Distribution Energy Management
§ WiMax Smart Grid Communications
§ Durham Smart Grid Demo
Planning and Operational Ontario Ministry of Energy, Toronto, Ontario Canada 53 GW coincident peak demand. Canada 2013, 2014, 2015, 2016 Objectives/background/needs: Ontario Ministry of Energy awarded large funds awards to technology development companies in smart grid. Ministry needed an owner engineer who could provide technical inputs to the project scope and meeting objectives, review deliverables of the contractors, review progress and reports. Key deliverables and solution provided: Reviewed and provided technical advice on Primary project; electricity load aggregation and control technologies including technologies related to communication and control of industrial and commercial equipment; and interface with electricity system operator (IESO Ontario). Assessed technical risks and proposed mitigation strategy, including safety, privacy and security risks. Assessed technical aspects of commercialization risks and proposed mitigation strategy, including whether solution provides benefits to electricity utilities, intellectual property protection, and adherence to relevant codes and standards. Provided support and information to Ministry on Secondary projects.
Generation Connection Impact studies American Electrical Power Company, South Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.org/ 2012, 2013 SPP-DISIS-2012-002 – Group-7 — American Electrical Power Co-South – Generation Interconnection Impact studies for wind generation project. Power factor analysis, Identification & quantification of reactive power compensation, SVC applications, Load flow, stability studies. Objectives/background/needs: GCCIA network control center had operational difficulties in balancing voltage at interconnection points of member states. The issue was mainly due to excessive reactive power out of submarine cable and switching operations towards Bahrain system where there is excessive reactive power flow. Similar voltage issues were experienced around other interconnections particularly at back-to-back HVDC connection with Saudi Arabia. Key deliverables and solution provided: Determine an optimal voltage control solution. Solution enables the grid to maintain a zero or close to zero MVAR exchange at each interconnection point under a range of system conditions while maintaining system voltages within limits. Verify, validate data bases. Develop future base cases for all Member States interconnected network including HVDC modeling and applications. Develop scenarios. Prepare benchmark models. Contingencies to monitor MVAR exchange, Recommend HVDC control options for reactive power contributions limits. Develop mitigation measures using mechanically switched shunt reactive power devices & FACTS. Dynamic simulations. Investigate FACTS based solutions (SVC, STATCOM) – Sizes & location. Recommendations, specifications, cost estimates.
Voltage Control Study – Reactive Power Management Study Transmission system planning for future years 2013, 2014, 2015, 2016, 2017, 2018, 2027 9 Middle East states Interconnections planning up to year 2027 Planning and Operational Gulf Coordination Council Interconnections Authority (GCCIA) Saudi Arabia www.gccia.com.sa GCCIA presently owns & operates 400kV interconnection which links six GCC states, UAE, Bahrain, Saudi Arabia, Oman, Qatar & Kuwait with expansion plans to 3 new states of Egypt, Turkey & Iraq. GCCIA Grid is connected with Saudi Arabia through BtB HVDC links. Saudi Arabia 2012, 2013 Objectives/background/needs: GCCIA network control center had operational difficulties in balancing voltage at interconnection points of member states. The issue was mainly due to excessive reactive power out of submarine cable and switching operations towards Bahrain system where there is excessive reactive power flow. Similar voltage issues were experienced around other interconnections particularly at back-to-back HVDC connection with Saudi Arabia. Key deliverables and solution provided: Determine an optimal voltage control solution. Solution enables the grid to maintain a zero or close to zero MVAR exchange at each interconnection point under a range of system conditions while maintaining system voltages within limits. Verify, validate data bases. Develop future base cases for all Member States interconnected network including HVDC modeling and applications. Develop scenarios. Prepare benchmark models. Contingencies to monitor MVAR exchange, Recommend HVDC control options for reactive power contributions limits. Develop mitigation measures using mechanically switched shunt reactive power devices & FACTS. Dynamic simulations. Investigate FACTS based solutions (SVC, STATCOM) – Sizes & location. Recommendations, specifications, cost estimates.
Generation Interconnection Impact studies Transmission Owners System worked on: PENELEC Dayton P & Light Co Ohio Edison PECO Baltimore Gas/ Electric Public Service Elect & Gas Commonwealth Edison Allegheny Power Jersey Central Power/ Light Co Planning and Operational PJM Interconnections LLC, USA American Electrical Power First Energy Corp Dominion Power Co – Virginia Power Company USA http://www.pjm.com/ 2008-2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017, 2018, 2019, 2020, 2021 Ongoing -Present Over 400 renewable generation connection assessment studies successfully completed. Mostly renewable generation additions Around 130,000 MW generation capacity planned for the north-eastern grid. Generation Interconnection Impact studies for a large number of generation requests. Load flow, extensive stability studies, studies automation, extensive modeling and analysis trouble shooting, Identification and quantification of reactive power compensation, SVC applications, HVDC assessments, stabilizer parameters fixing to damp oscillations, identification of reinforcement requirements. QA, reports. Largest power pool of in North America, Dispatches about 180,400 MW of generating capacity over 61,200 miles of transmission lines. Coordinates movement of wholesale electricity in Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia & Distt. of Columbia.
Generation Connection Impact studies Oklahoma Electric and Gas Company www.oge.com Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.org/ 2011 SPP-DISIS-2012 Grp-14 – Oklahoma Electric &Gas Company http://www.oge.com/Pages/Home.aspx Generation Interconnection Impact studies for wind generation project. Power factor analysis, Identification and quantification of reactive power compensation. Extensive load flow, stability studies. 53 GW coincident peak demand. SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma,Texas
Power system stability analysis and NEPRA Grid Code/planning criteria review Generation connection assessment Planning and Operational Laraib Energy Ltd. Owned by Power GDF Suez, UK and Hubco International 84MW Hydro power project Pakistan http://www.Laraibenergy.com/ 2012 Objectives/background/needs: A previous generation connection assessment study of hydro power plant showed that stability criteria is not met due to less than required moment of inertia of the machines. Plant commissioning was delayed and developers tried all the possibilities to overcome but failed. Developers had reportedly showed losses in Millions of Dollars due to delays and other hardware changes they made already. Developers wanted POWER-tek to investigate and suggest solutions. Key deliverables and solution provided: Review previous reports, applicable Grid Code, and gaps in planning criteria. Perform stability studies as per Grid Code and National Transmission and Dispatch Company requirements including simulating SLGF/3phase fault and stuck breaker. Provided references and compared with planning criteria of other transmission companies – North America and comparable transmission companies, Suggestion on planning criteria improvement This hydro plant connection was not meeting the stability criteria. POWER-tek evaluated criteria and highlighted the gaps in criteria interpretation and performed the load flow and stability studies. Studies showed that plant meets the right interpretation of Grid code. Plant was commissioned successfully right after this report findings submission presentation.
Distributions system planning and solar power generation connection assessment studies and engineering cost estimates Different distributions system areas in Ontario, Over 12MW each, 21 solar power projects, connection assessment Planning and Operational Sky Power Ltd. www.skypower.com A major Solar Project Developer in North America Owns utility-scale fully operating solar park. Over 1.5 GW of solar parks in pipeline or under construction or at various stages of development. Canada 2011, 2012 System modelling, feeder modeling, analysis, simulations, analysis, prepare planning specifications. System loss estimation before and after addition of local distributed generation. Prepare cost estimates based on cost allocation rules, published technical requirements, Interaction support to local distribution company. Re-evaluated connection assessment studies & accordingly reviewed cost estimates. Results showed significant capital cost reduction for developer. Extensive use of distributions system analysis software.
Solar power generation connection assessment studies and engineering cost estimates Planning and Operational Val Caron and Genarm solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Planning and Operational Mighty-Solar solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Planning and Operational SparkerLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Planning and Operational RayLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Planning and Operational GoodLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Planning and Operational Aria solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Planning and Operational BeamLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Planning and Operational DiscoveryLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Planning and Operational CityLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Planning and Operational EarthLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Planning and Operational LunarLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Planning and Operational FotoLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Planning and Operational Illumination solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Generation Connection Impact studies, NEBRASKA Public Power Planning and Operational Southwestern Power Pool Inc. USA USA http://www.spp.orgnppd.com/ 2011 SPP-DISIS-2011 – Group-9 — NEBRASKA Public Power District. http://www.nppd.com/ Generation Interconnection Impact studies for wind generation project. Power factor analysis, Identification and quantification of reactive power compensation. Extensive load flow, stability studies. 53 GW coincident peak demand. SPP has members in nine states: Arkansas, Kansas, Louisiana, Mississippi, Missouri, Nebraska, New Mexico, Oklahoma,Texas
Generation Connection Impact studies Planning and Operational British Colombia Transmission Corporation, Vancouver, BC, Canada Presently BC Hydro Canada www.bchydro.ca Operates voltages 69 to 500 kV, stretches over 75,000 hectares. Operates 30 hydroelectric facilities, three natural gas thermal power plants. Generates between 43,000 & 54,000 gigawatt hours of electricity annually. Canada 2010 Objectives/background/needs: BC Hydro had work load for generation connection assessment with pressing and tight timelines under renewable generation projects incentives. Key deliverables and solution provided: Extensive generation interconnection impact studies using PSS/E for a number of generation requests. Load Flow, Stability Studies. POWER-tek helped meeting the timelines and quality completion of the studies and workload.
Long Range Transmission Planning Study Planning and Operational South Mississippi Electric Power Association Hattisburg, MS 39402 USA www.smepa.coop, 840MW peak load, 69 to 230kV transmission system. USA 2007, 2008 Objectives/background/needs: SMEPA required their long-term transmission system plan development. Key deliverables and solution provided: Evaluate planning criteria and guidelines, stress cases, main and alternatives and selection criteria development, finalize cases and ranking, develop intermediate stages, economic analysis, preferred plan selection, stability assessment, PV/QV analysis, identify reactive support, short circuit testing, final expansion plan, report.
Interconnection Impact Studies, Power System Studies Planning and Operational Pterra Consulting, USA For different clients, USA Power system consulting company. USA http://www.pterra.com/ 2006, 2007, 2008, 2009, 2010, 2011 Numerous transmission interconnection impact studies simulations and Results documentation.
Performing PJM Load Deliverability Test Analysis Planning and Operational PJM Interconnections LLC, USA USA http://www.pjm.com/ 2006 Objectives/background/needs: PJM control center carries out a performance period testing for capacity emergency transfer limit. Obtain assurance that the internal & external firm capacity resources can be delivered to the area experiencing a localized capacity emergency by carrying out the ‘Deliverability to the Load’ test. Capacity emergency transfer limit (CETL) analysis using MUST and PSS/E. Perform voltage and thermal load deliverability tests. Key deliverables and solution provided: POWER-tek determined transfer capability & actual ability of the transmission system to support deliveries of energy to an electrical area experiencing a capacity emergency. POWER-tek identified and provided solutions to short comings.
Power System Studies, Customer Impact Studies and Support Planning and Operational Hydro One Network Inc. Canada/Acres International Ltd, Canada 27000 MW system transmission system owner crown organization in Ontario Canada. Canada http://www.hydroone.com/ 2005 Impact studies for Ontario 1000 MW RFP for numerous wind power plants & 2500 MW conventional power plants. Detailed simulations and reporting. Meeting & interaction with project developers to sort out interconnection technical matters. Distribution system generation interconnection impact studies.
Power System Studies Planning and Operational Pterra Consulting, USA USA http://www.pterra.com/ 2005 Generation connection assessments-Power system studies. Results documentation.
Grid Supply Options For Victor Diamond Project Planning and Operational De Beers Canada Corporation Canada http://www.debeerscanada.comamec.com/ 2004 Objectives/background/needs: De Beers required power system planning studies relating to several IESO Canada grid supply alternatives for the Victor Diamond Project (VDP). This required very long transmission line to feed the variable loads. Key deliverables and solution provided: Model set up load flow and stability studies for alternatives, Reactive support and SVC requirements and line energizing analysis for long lines, SVC facilities need determination and sizing, Quantification and comparing of line losses, Comparing alternatives and recommendations Since 1888, De Beers has been involved in all aspects of the diamond business. From its mining operations across Africa, and Canada, the company produces about 35 per cent of the world’s supply of rough diamonds. Toronto. AMEC Americas Ltd, Canada,
Connection Assessment Study for 300 MW Wolfe Island Wind Farm Project Planning and Operational AMEC Americas Ltd/ Canadian Renewable Energy Corporation, Canada Canada http://www.amec.com/ 2004 Data base review and quality checks for IESO controlled grid system model. Load flow studies for new connection for about 300 MW. Review interface loadings, linear analysis, Voltage impact studies and contingency analysis, Local area impact review, Transient stability studies & wind gust analysis. Presentation and meetings with Hydro One Networks Inc. & IESO.
NERC Compliance, Planning and Operational Alabama Electric Cooperatives Inc. USA PowerSouth Energy Cooperative, USA http://www.powersouth.com/ 2004 Objectives/background/needs: AEC required periodic NERC compliance studies and submission to SERC/NERC. Key deliverables and solution provided: Review of PSS/E data quality for AEC region, (load flow + stability models from SERC), Verify stability data and models for AEC machines, Load flow stressed cases set-up, System stability studies using stressed cases, Documentation & data management.
Connection Assessment Study for 100 MW Erie Wind Farm Development Project For IESO Ontario Canada Planning and Operational AIM Power Co/MacViro Consultants Inc. Independent Electricity System Operator (IESO) Canada www.ieso.ca Manages Ontario’s about 27000MW peak load, power system and operating the wholesale market. Independent Electricity System Operator (IESO) Canada Manages Ontario’s about 27000MW peak load, power system and operating the wholesale market. Canada http://www.ieso.ca/ 2004 Data base review and quality checks for IESO controlled grid system model. Load flow studies for new connection for about 150 and 100 MW. Review interface loadings, linear analysis, Voltage impact studies and contingency analysis, Local area impact review, Transient stability studies & wind gust analysis. Presentation and meetings with Hydro One Networks Inc. & IESO. Objectives/background/needs: IESO hired number of new engineers and there was extensive need of system studies. IESO wanted to train their staff by working actual planning work on real cases. Key deliverables and solution provided: Power system analysis training courses, Case development, data and models review, System studies and formal training course using the state-of-the-art tools. Objectives/background/needs: TVA had a large power plant outage due to certain operation conditions. TVA Generator control data review, current system models used, investigated suitability & effectiveness. Analytical tuning and evaluate power system stabilizer gain. Testing for other system conditions. Development of analytical settings/scheme. PSS tuning training course delivery. Key deliverables and solution provided: Investigated a serious 500kV line outage due to generation dynamic instability. Updated models and parameters of the excitation systems and stablizers at four large power plants resulting in improved oscillatory stability.
System stability analysis of selected problems Hands-on training and ongoing support Planning and Operational Independent Electricity System Operator (IESO) Canada Canada http://www.ieso.ca/ 2004 Objectives/background/needs: Three transmission companies wanted to train their staff by working actual planning work on real cases. Key deliverables and solution provided: Prepared data and past studies review, System stability simulations and analysis of selected problems, Identifications of stability limitations and solutions, Stability studies formal training course, Hands-on training and ongoing support, recommendations, report. Owned by 39 state’s 42 electric member cooperatives. Electric transmission for Georgia’s electric co-ops. Over 9,294 megawatt load, Over 3,000 miles of transmission lines, over 600 substations. Key deliverables and solution provided: Identify stressed areas for analysis and planning, locations where voltage power flow can be close to limits, interconnection points & alternatives with neighboring countries, Impact of power transfer increase b/w countries for generation scenarios. Evaluation of system strength, assessment report for expansion plans and impact on energy import/export. Determine transfer capability among countries.
PSS Modeling and Tuning for Cumberland Plant at TVA Planning and Operational Tennessee Valley Authority (TVA), USA www.tva.com Owns & operates one of the largest & most reliable transmission systems in North America, serving 9 million residents in an 80,000-square-mile area spanning portions of seven states. The first utility to build 500kV transmission lines, operates/maintains one of the largest single-owner transmission systems in United States. USA 2003 Objectives/background/needs: TVA wanted to develop and update the grid model with latest exciter systems information. This was required to ensure that grid model has all the parameters updated as has been changed on site. For modeling accuracy investigations, it was frequently observed before that this data base was not updated. Key deliverables and solution provided: Initial Data Review and Logistics, Describe Current Excitation System Models Used. Site visit, inspection. Derivation of model structure and preliminary settings. Identify the existing ‘As found’ excitation system model data in PTI PSS/E format. Identify Testing to complete PSS/E model data. System studies to excitation system settings, System studies to evaluate excitation system settings improvements. Report.
System stability analysis of selected problems Hands-on training and ongoing support Planning and Operational Alabama Electric, Power South Energy, Georgia Transmission, South Mississippi Electric Power Authority, USA USA http://www.gatrans.compowersouth.com/ 2003 Objectives/background/needs: Due to increased incentives and focus on generation requirement, TVA had long back log for developers generation connection assessment applications. TVA management required to clear up the back log in minimum possible time. Key deliverables and solution provided: Successfully completed 21 different Impact studies/tasks of IPP Interconnection. System studies using PSS/E for a large number of IPP requests. Load flow, Stability studies. Power transfer studies for number of Marketers/ IPPs using MUST software. Developed IPLAN routines to make studies process efficient. Developed studies procedures/methodology, information management system, QA system, reports, presentations. Developed and study process Improvements. Progress reporting “Issues Log”.
Investigation of WAPDA and Karachi Electric Power Systems and Interconnection of Pakistan and Two Neighboring Countries Planning and Operational ABB USA, ETI Raleigh, NC 27609, USA http://www.abb.us/ USA http://www.abb.us/ 2002 Objectives/background/needs: TVA had an incident that required small signal stability analysis. TVA wanted to have in-house hands on studies capabilities. Key deliverables and solution provided: Developed project objectives and project management plan. QA with EPRISolutions. Revised EPRISolutions proposal based on objectives. Developed & conducted TVA informal WARM-UP training and learning sessions. Developed present and future base cases for the studies, identifying small signal stability problems.
TVA Plants Excitation System Modeling Review and System Performance Improvements Planning and Operational Tennessee Valley Authority (TVA), USA Chattanooga, TN www.tva.com USA http://www.tva.com/ 2002 Objectives/background/needs: TVA required to update their system data base for process efficiencies and increase in delivery speed of studies. Key deliverables and solution provided: Review proposals and data needs. (studies nature, database formats), Develop data base structure and formats. Collect, update, sort, refine, and punch data. QA with EPRI Solutions – data/report review. Develop interface with TVA existing database.
Generation Interconnection Impact Studies Power Transfer Request Studies Planning and Operational Tennessee Valley Authority (TVA), USA Chattanooga, TN www.tva.com USA http://www.tva.com/ 2002 Objectives/background/needs: Gulf Salt Power required independent third party to system studies with SEC grid and do engineering for protection relay setting. ABB further hired POWER-tek to provide the solutions. Key deliverables and solution provided: Load flow studies with utility interconnection for checking and confirming replaced transformer related to 890kW motor starting problems, System efficiency enhancement, losses reduction with optimized applications, Fault level simulations to get new values due to transformer replacement. Motor starting studies, Relay settings, coordination curves development.
Small Signal Stability Investigations, & Training In-House Project Management Support and Training. Planning and Operational Tennessee Valley Authority (TVA), USA USA http://www.tva.com/ 2002 Objectives/background/needs: Gulf Salt Power required independent third party to system studies with SEC grid and do engineering for protection relay setting. ABB further hired POWER-tek to provide the solutions. Key deliverables and solution provided: Load flow studies with utility interconnection. System efficiency enhancement, losses reduction with optimized applications, Fault level simulations. Motor starting studies, Relay settings, coordination curves development.
Power distribution system studies and Relay-Settings Update after Transformer Replacement Planning and Operational Gulf Salt Power Company ABB Services Company, Saudi Arabia Saudi Arabia http://www.gulfsalt.com/ 2001 Distribution System Studies Operational load flow analysis for reasons of certain operating configurations, Steady State and Dynamic simulations/analysis, Recommended solution through appropriate transmission network changes and protective equipment setting adjustments.
Utility Interconnection Review for Distribution System Studies and Relay Coordination Planning and Operational Gulf Salt Power Company ABB Services Company, Saudi Arabia Saudi Arabia http://www.gulfsalt.com/ 2001 Objectives/background/needs: FKPCL plant was in operation but machines were tripping frequently. FKPCL wanted to investigate the reasons and carry out a protection audit for fixing the problem. Key deliverables and solution provided: Extensive data collection of substations surrounding the FKPCL., Relay Settings review and corrections. Confirmation checks and analysis, Tripping analysis of lines and propagation of faults, Fault analysis to determine reasons of certain operating configuration of the system, Operational load flow analysis for reasons of certain operating configurations, Steady State and Dynamic simulations/analysis, Recommended solution through appropriate transmission network changes and protective equipment setting adjustments. After making recommended changes these machines trippings were successfully eliminated. Objectives/background/needs: Sitara chemicals wanted to audit the system efficiency, identify and quantify the system losses and increase efficiency.
Power System Operational and Protection Audit for Analysis of Repeated Tripping of Machines due Planning and Operational Fauji Kabirwala Power Company Ltd. FKPCL (157MW IPP) (El-Paso, USA) USA http://www.faujipower.com/ 2001 System modeling, load flow studies, interconnection of utility system, losses quantification and analysis. Key deliverables and solution provided: System modeling, load flow studies, interconnection of utility system, losses quantification and analysis. Existing system Energy billing meters testing and Energy accounting system development. Simulations for Energy losses confirmation and recommendations for reduction. System Expansion studies, Load flow, Fault level. Relay settings, coordination, with utility interconnection and in-house generation additions. Detailed Engineering Design Review of substation. Equipment Specification Development. Harmonic analysis, measurements and filter design. After implementing the recommendations and accounting tools use efficiency was increased significantly.
Study of Energy Metering and Accounting System of Sitara power distribution system, System Losses Analysis, Harmonic Analysis and Filter Design Plant Expansion, Generation Addition, & Utility Interconnection Analysis. Planning and Operational Sitara Chemicals Industries Ltd. 30MW Industrial Power System Faisalabad. Pakistan http://www.sitara.com.pk/ 2001 Objectives/background/needs: PEPCO wanted to equip transmission and 8 distribution companies for in house software installations, develop staff capabilities and hands on training. Key deliverables and solution provided: Provided Transmission and Distribution System Planning Software under International Competitive Bidding of World Bank. (16 copies of PSS/ADEPT and 10 copies of PSS/E), Training of the software, system analysis methodology and techniques, PSS/E, PSS/ADEPT installation and its functional testing at all 10 locations of DISCOs, NTDC, Long term Maintenance and Support services to DISCOs and NTDC to use the software for its intended purposes. Hands on training and support.
Transmission and Distribution System Analysis Software, Installation and Training, Maintenance and Support for WAPDA, NTDC, 8 DISCos Planning and Operational Pakistan Electric Power Company Pakistan Water & Power Development Authority (WAPDA) About 18000MW peak load system. NTDC operates/maintains nine 500kV substations, 4160 km 500 kV lines & 4000 km of 220 kV lines. Pakistan http://www.wapda.gov.pk,ntdc.com.pk/ 2001 Steady state load flow studies & contingency analysis. Evaluation of transmission system capacity and losses. Steady state load flow studies & contingency analysis. Evaluation of transmission system capacity and losses. Short circuit & stability studies to evaluate the plant interaction with grid system. Recommendation of remedial measures to overcome transmission constraints causing problems for plant to remain in synchronism with grid system. Review of transmission plans in the region and recommendation of changes, with prioritized transmission line additions. Recommendations for the IPP and relevant utility.
Fauji Kabirwala Plant Interconnection Impact Studies with National Grid System Planning and Operational NEPCO/ENRON, Redmond, Washington, USA Fauji Kabirwala Power Co. Ltd. Pakistan http://www.faujipower.com/ 1999, 2000 Objectives/background/needs: WAPDA wanted to equip their national power control center in house software installations, develop staff capabilities and hands on training. Key deliverables and solution provided: Training of the software, system analysis methodology and techniques to National Power Control Center engineers, PSS/E software-System Data development, installation & its functional testing, PSS/E Software procurement to improve the computerized analysis
Up-gradation of the System Analysis Software, Installation, Training and Maintenance/Support for National Power Control Center Planning and Operational Pakistan Water & Power Development Authority (WAPDA) Pakistan http://www.wapda.gov.pk,ntdc.com.pk/ 199 Objectives/background/needs: This plant was under capacity and reliability testing. After many unsuccessful tests, they wanted to simulate the plan and grid system to investigate the issues and provide recommendations for successful capacity and reliability tests. Key deliverables and solution provided: Power system studies using PSS/E software to identify and propose remedial solutions for removing inherent transmission constraints in dispersing plant’s power under different operating scenarios. Load rejection/Load variation test simulations for evaluating plant reliability. Short circuit studies. Stability analysis to check plant interaction with the grid system along with some adjustment of Excitation system parameters. Determine benefits contributed by Liberty Plant to Utility’s power system. Recommendations. Objectives/background/needs: This plant was under capacity and reliability testing. After many unsuccessful tests, they wanted to simulate the plan and grid system to investigate the issues and provide recommendations for successful capacity and reliability tests.
Transmission Interconnection Impact and Operational Studies of 235MW Liberty Power Plant (IPP) with National Grid System Planning and Operational Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia. Liberty Power Ltd. Malaysia http://www.tnb.com.my/ 1999 Key deliverables and solution provided: Steady state and Dynamic simulations/analysis for reactive power capability testing. Recommended solution through transmission network changes & equipment setting adjustments to remove different bottlenecks for reactive power capability acceptance tests for different gr id operating scenarios. Short circuit analysis to determine grid system strength around FKPCL plant. Determine plants merit order through economic dispatch analysis. Support for solution implementation for reactive power tests. TNB’s comprises of generation, transmission & distribution of electricity, with a total installed generation capacity of about 12,000 MW.
Grid System Operational and Dispatch Analysis for Fauji Kabirwala Plant Testing Planning and Operational NEPCO/ENRON, Redmond, Washington, USA Fauji Kabirwala Power Company Ltd. (157MW IPP) Pakistan 1999 Objectives/background/needs: Allai Khawar and Chor Nala hydro power plant was not included in overall generation plan of WAPDA. Allai Khwar consultants requested to update the plan with WAPDA models. Key deliverables and solution provided: Development of computer model data set for generation planning for inclusion of Allai Khwar and Chor Nala hydro power plants. Simulation & analysis of generation expansion plans inclusive of both plants. Comparisons with equivalent thermal plants. Recommendations for technical/economical justifications of both plants. Report. Objectives/background/needs: This plant was under capacity and reliability testing. After many unsuccessful tests, they wanted to simulate the plan and grid system to investigate the issues and provide recommendations for successful capacity and reliability tests.
Least Cost Generation Plan Analysis for Inclusion of 124MW Allai Khwar and 1050MW Chor Nala Hydro Projects Planning and Operational Lahmeyer International, Germany , Knight Piesol & Allai Khwar Consultants AES, USA USA http://www.lahmeyer.de/ 1998 Least Cost Generation Plan Analysis Key deliverables and solution provided: Detailed System simulations/analysis to recommend practical system operational adjustments in order to overcome power flow constraints for facilitating full dispatch of both AES plants & for plants reactive power capability testing. Recommendations to maximize AES plant factor. Objectives/background/needs: Saud Consult needs support on power system modeling and analysis for planning of SCECO West Region.
Analytical Studies for Economic Dispatch, Transmission System Capacity, and Reactive Power Capability Test Simulations for 727MW AES Lal Pir Power Plants Planning and Operational A global power plant developer corporation. Pakistan http://www.aes.com/ 1997, 1998 Reactive Power Capability Test Simulations for 727MW AES Lal Pir Power Plants Key deliverables and solution provided: Assistance provided to SAUDCONSULT for preparing transmission master plan of next 20 years in terms of: Defining complete scope of work & its methodology.
Year-wise Next 20 years of Transmission System Expansion Studies of EWR Region, SCECO West, Saudi Arabia Planning and Operational Saudi Consulting Services SAUDCONSULT, Saudi Arabia Multidisciplinary international consultant Saudi Arabia http://www.ww.saudconsult.com/ 1997 Study scenarios development for 380/110kV transmission interconnection lines and regional 110kV system, load flow and short circuit studies, system losses evaluation and voltage profile evaluation. Sorting out the matter with SCECO West. Objectives/background/needs: Prepare a comprehensive EHV/HV transmission system plan for proposed 19 large and medium size hydro power plants in a restructured & private environment. Prepare a comprehensive EHV/HV transmission system plan for proposed 19 large and medium size hydro power plants in a restructured & private environment. Key deliverables and solution provided: System planning at EHV Transmission, sub-transmission & distribution level. Prepared connection schemes, load flow, short circuit and stability studies, meeting grid code, System loss impact with &without incoming 19 hydro plants. System optimization. Recommendations
Transmission System Planning up to Year 2020 for Northern Part of Pakistan. Planning and Operational GTZ, International cooperation for sustainable development, Germany Operates in 130 countries. Over 17,000 staff globally. Pakistan http://www.giz.de/ 1997 System studies for plant interconnection impact. Recommendations for Design of generator, excitation/governing control systems. Developed most suitable transmission arrangement out of candidate options – technical/financial analyses. Load flow, short circuit and stability studies, recommendations.
Transmission system planning & Interconnection Impact studies of 19 hydropower plants) Planning and Operational Pakistan Engineering Services, Lahore, Pakistan Multidisciplinary international consultant Pakistan http://www.pes.net.pk/ 1996, 1997 Objectives/background/needs: Engro wanted to expand their power system to increase their fertilizer production capacity. This required to add new generators as well as many large size motors. This required to review fault levels with given breaker capacities. This also required to add new buses and balance the load. The main challenge was to optimize the motor starting requirements with current limit reactors that were required to limit the fault levels. Key deliverables and solution provided: Distribution system expansion planning for new & existing equipment on new loading conditions. Load flow, short circuit, load impact & motor starting. Power system losses estimation and reduction. Design and application of “Current Limiting Reactors” to limit the short circuit currents. Optimization of motor starting with the designed current liming reactor. Studied Dynamic behavior of machines with induction of new generation & current limiting reactor. Developed Planning Options and Cost Estimates Recommendations and report.
Exxon Electrical Distribution Network Expansion and Balancing Studies Planning and Operational Exxon (Engro) Chemicals Ltd/Jafri Associates About 50MW power system for fertilizer production plant. Pakistan http://www.engro.com/ 1996, 1997 Objectives/background/needs: Allai Khawar hydro power plant was not included in overall generation plan of WAPDA. Allai Khwar consultants requested to update the plan with WAPDA models. Key deliverables and solution provided: Development of system model data set for generation planning for inclusion of Allai Khwar hydro power plant. Simulation of system generation expansion plans inclusive of Allai Khwar hydro plant comparing three water storage options. Results compilation and comparative analysis.
Least Cost Generation Plan Analysis for inclusion of 124MW Allai Khwar Hydro Plant Planning and Operational Lahmeyer International, Germany, Knight Piesol & Allai Khwar Multidisciplinary international consultant Pakistan http://www.lahmeyer.de/ 1996, 1997 Objectives/background/needs: WAPDA was expecting surge of new generation in southern part of the network which required a quick transfer capacity increase from south to northern load centers. Key deliverables and solution provided: Recommendations to enhance EHV transmission system capacity for transferring bulk power over long distance across the country considering the options of SVC, Series compensation. Transmission System Optimization with respect to incoming IPPs generation capacity additions. Planning criteria review, Review of previous transmission plans and reports. Load flow and transient stability studies, and Optimal power flow analysis using PSS/E, PSS/OPF and TPLAN software programs. Electrical, mechanical and civil specifications for series compensation equipment.
Study of Optimisation of Reactive Power Compensation for WAPDA Transmission System and Preparation of Specifications for Compensation Equipment Power Technologies Inc. and Stone & Webster Planning and Operational Pakistan Water & Power Development Authority (WAPDA) Pakistan http://www.wapda.gov.pk,ntdc.com.pk/ 1996 System studies for plant interconnection impact. System studies for plant interconnection impact. Recommendations for Design of generator, excitation/governing control systems. Developed most suitable transmission arrangement out of candidate options through technical and financial, and environmental analysis. Load flow, short circuit and stability studies, recommendations.
Facility Management Consultant (FMC) for MFF Second Power Transmission Enhancement Investment Program Tranche-I
Ext.of 600 MVA,500/220kV Auto-Transformer at 500kV Sahiwal Substation and New Lahore
Extension of line bay and augmentation of transformer at New Rewat
Ext. of line bays at Faisalabad West and Lalian Grid Station
500 kV D/C TL of 500 kV Multan-Gatti at Faisalabad West (40 kM)
220kV D/C TL Faisalabad West –Lalian (55 kM)
Civil works installation for TL 500 kV Guddu Muzaffargarh (250km)
Engineering Design National Transmission & Despatch Company (NTDC)
Asian Development Bank (ADB)
Pakistan http://www.ntdc.com/ 2017, 2018, 2019, 2020, 2021 Objectives/background/needs:
Project implementation including construction supervision and management of Tranche 1, social and environmental plan management and monitoring for compliance;
Capacity development including preparation of safety manual for NTDC as per the requirement of National Electric Power Regulatory Authority (NEPRA).
Subprojects of Tranche 4 will be identified which includes, preliminary design, bids evaluation, detailed design review and project management of Tranche 4 can be added to the work scope of FMC. ? Prepare a project implementation manual covering the construction project organization, payment procedures, and project time schedule and quality assurance program
? Review and approve the engineering design drawings, calculations, delivery program, and documents submitted by the contractors for each contract;
? Provide preliminary design in preparation of bidding documents as/when requested by NTDC;
? Support NTDC in bids evaluation as/when requested by NTDC,
? Develop and implement a construction quality assurance program for each contract;
? Confirm compliance with technical data & specifications as per the contract
? Monitor implementation progress and identify what actions and resources are required to address the contractors needs to achieve the construction schedule;
? Inspect equipment/materials before shipment upon arrival and upon erection;
? Review the contractor’s test procedures for compliance with manufacturers’ requirements and design criteria, witness selected tests and review the test results and submit a report;
? Monitor the execution of the contracts in line with the time schedules and the work programs provided by the contractors;
? Prepare/issue completion certificates, operational acceptance certificates and defect liability certificate as per the provisions of the contract.
? Review and certify the commissioning test reports submitted by the contractors/ suppliers; attend the commissioning phase; establish the list of deficiencies after commissioning; and prepare a time frame for the contractors/suppliers to remedy the deficiencies. Establish a monitoring program for NTDC;
? Review and approve ssemp prepared by contractors;
? Monitor emp/ssemp implementation progress onsite and assess the progress as per the requirements given in emp/ssemp/environmental approval from epa and address the gaps to ensure compliance;
? Monitor implementation of larps, caps, ddrs and emp implementation and provide early warning of any potential safeguard risks;
? Undertake capacity building activities as stipulated in the iee/eia;
? Prepare a capacity development plan to assist NTDC in meeting the mff and tranche 1 intended outputs and outcomes;
? Review of current safety procedures in vogue in NTDC & identify gaps in comparison with international practices and NEPRA requirements. Prepare a manual based on the above findings acceptable to NTDC.
Facility Management Consultant (FMC) for MFF Second Power Transmission Enhancement Investment Program Tranche-II · 220 kV Mirpur Khas substation · 220 kV D/C TL from T.M.Khan (85km) · 220kV Zhob Substation · 220kV D.I.Khan-Zhob TL (220kM) · 220kV Guddu Sibbi TL (370km) Engineering Design National Transmission & Despatch Company (NTDC)
Asian Development Bank (ADB)
Pakistan http://www.ntdc.com/ 2017, 2018, 2019, 2020, 2021 Objectives/background/needs:
Project implementation including construction supervision and management of Tranche 1, social and environmental plan management and monitoring for compliance;
Capacity development including preparation of safety manual for NTDC as per the requirement of National Electric Power Regulatory Authority (NEPRA). Subprojects of Tranche 4 will be identified which includes, preliminary design, bids evaluation, detailed design review and project management of Tranche 4 can be added to the work scope of FMC. Scope of work:
The key tasks and deliverables are as:
? Prepare a project implementation manual covering the construction project organization, payment procedures, and project time schedule and quality assurance program
? Review and approve the engineering design drawings, calculations, delivery program, and documents submitted by the contractors for each contract;
? Provide preliminary design in preparation of bidding documents as/when requested by NTDC;
? Support NTDC in bids evaluation as/when requested by NTDC,
? Develop and implement a construction quality assurance program for each contract;
? Confirm compliance with technical data & specifications as per the contract
? Monitor implementation progress and identify what actions and resources are required to address the contractors needs to achieve the construction schedule;
? Inspect equipment/materials before shipment upon arrival and upon erection;
? Review the contractor’s test procedures for compliance with manufacturers’ requirements and design criteria, witness selected tests and review the test results and submit a report;
? Monitor the execution of the contracts in line with the time schedules and the work programs provided by the contractors;
? Prepare/issue completion certificates, operational acceptance certificates and defect liability certificate as per the provisions of the contract.
? Review and certify the commissioning test reports submitted by the contractors/ suppliers; attend the commissioning phase; establish the list of deficiencies after commissioning; and prepare a TIME frame for the contractors/suppliers to remedy the deficiencies. Establish a monitoring program for ntdc;
? Review and approve ssemp prepared by contractors;
? Monitor emp/ssemp implementation progress onsite and assess the progress as per the requirements given in emp/ssemp/environmental approval from epa and address the gaps to ensure compliance;
? Monitor implementation of larps, caps, ddrs and emp implementation and provide early warning of any potential safeguard risks;
? Undertake capacity building activities as stipulated in the iee/eia;
? Prepare a capacity development plan to assist NTDC in meeting the mff and tranche 1 intended outputs and outcomes;
? Review of current safety procedures in vogue in NTDC & identify gaps in comparison with international practices and NEPRA requirements. Prepare a manual based on the above findings acceptable to NTDC.
Facility Management Consultant (FMC) for MFF Second Power Transmission Enhancement Investment Program Tranche-III · 500kV Lahore North Substation · 500kV D/C TL (150kM) · 220kV D/C TL (44kM) · 220 kV Jhampir –II Grid Station · Addition of 250 MVA TF at 220kV Jhampir-I · 220kV D/C TL 35 kM · 132 kV D/C TL 220kM · Conversion of existing 220 kV NGPS AIS to GIS in Multan Distributions system planning and solar power generation connection assessment studies and engineering cost estimates Different distributions system areas in Ontario, Over 12MW each, 21 solar power projects, connection assessment Engineering Design National Transmission & Despatch Company,(NTDC)
Asian Development Bank
Tetra-Tech WEI Inc. Mississauga, Canada
For Wpd Canada Corporation
Sky Power Ltd
Pakistan http://www.tetratech.com
skypower.com/
2015, 2017, 2018, 2019, 2020, 2021 A major Solar Project Developer in North America Owns utility-scale fully operating solar park. Over 1.5 GW of solar parks in pipeline or under construction or at various stages of development.

Objectives/background/needs: ·
Project implementation including construction supervision and management of Tranche 1, social and environmental plan management and monitoring for compliance;
Capacity development including preparation of safety manual for NTDC as per the requirement of National Electric Power Regulatory Authority (NEPRA). Subprojects of Tranche 4 will be identified which includes, preliminary design, bids evaluation, detailed design review and project management of Tranche 4 can be added to the work scope of FMC.
To prepare project implementation manual covering the construction project organization, payment procedures, and project time schedule and quality assurance program
Review and approve the engineering design drawings, calculations, delivery program, and documents submitted by the contractors for each contract;
Provide preliminary design in preparation of bidding documents as/when requested by NTDC;
support NTDC in bids evaluation as/when requested by NTDC,
develop and implement a construction quality assurance program for each contract;
confirm compliance with technical data & specifications as per the contract
monitor implementation progress and identify what actions and resources are required to address the contractors needs to achieve the construction schedule;
inspect equipment/materials before shipment upon arrival and upon erection;
review the contractor’s test procedures for compliance with manufacturers’ requirements and design criteria, witness selected tests and review the test results and submit a report;
monitor the execution of the contracts in line with the time schedules and the work programs provided by the contractors;
prepare/issue completion certificates, operational acceptance certificates and defect liability certificate as per the provisions of the contract.
review and certify the commissioning test reports submitted by the contractors/ suppliers; attend the commissioning phase; establish the list of deficiencies after commissioning; and prepare a time frame for the contractors/suppliers to remedy the deficiencies.
Establish a monitoring program for NTDC;
review and approve SSEMP prepared by contractors;
monitor EMP/SSEMP implementation progress onsite and assess the progress as per the requirements given in EMP/SSEMP/Environmental Approval from EPA and address the gaps to ensure compliance;
monitor implementation of LARPs, CAPs, DDRs and EMP implementation and provide early warning of any potential safeguard risks;
undertake capacity building activities as stipulated in the IEE/EIA;
prepare a capacity development plan to assist NTDC in meeting the MFF and Tranche 1 intended outputs and outcomes;
review of current safety procedures in vogue in NTDC & identify gaps in comparison with international practices and NEPRA requirements.
Prepare a manual based on the above findings acceptable to NTDC.

Objectives/background/needs:
Regional distribution system planning for Hydro One Networks Inc including new renewable generation planning.
Wind farm and Hydro One distribution system model development.
Key deliverables and solution provided:
Load flow analysis for different scenarios (nominal, max. and min. voltage for different wind farm power outputs,0% to 100%, at the required power factor setting).
Equipment sizing calculations,
Cable sizing calculations for 27.6 kV collector system,
Assessment of the voltage fluctuations (i.e. upon start up and shut down of the turbines).
Reactive power analysis of the entire distributions system and wind farm in order to identify the need of a reactor/capacitor bank or other power electronic devices in order to fulfill Hydro One´s power factor requirements and less estimation.
Preparation of dynamic model of the wind farm,
Dynamic analysis of the system.
Analysis of temporary overvoltage issues in the wind farm.
Short circuit analysis,
Harmonic and Flicker analysis in order to identify possible risks of the wind farm not meeting the grid code requirements.
Extensive use of distributions system analysis software.

Solar power generation connection assessment studies and engineering cost estimates Engineering Design Mighty-Solar solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Engineering Design SparkerLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Engineering Design RayLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Engineering Design GoodLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Engineering Design Aria solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Engineering Design BeamLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Engineering Design DiscoveryLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Engineering Design CityLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Engineering Design EarthLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Engineering Design LunarLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Engineering Design FotoLight solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection assessment studies and engineering cost estimates Engineering Design Illumination solar power plant, Ontario Canada Canada 2012 Over 12MW power projects connection assessment studies. System analysis, simulations, prepares planning specifications. Prepare cost estimates based on cost allocation rules, published technical requirements.
Solar power generation connection – engineering cost estimates Over 12MW each, 21 solar power projects connection Engineering Design Sky Power Ltd. USA http://www.skypower.com/ 2012 A major Solar Project Developer in North America Owns utility-scale fully operating solar park. Over 1.5 GW of solar parks in pipeline or under construction or at various stages of development Over 12MW each, over 21 solar power projects connection assessment studies and prepare equipment requirements/additions. Prepare cost estimates based on cost allocation rules and published technical requirements. Interaction support with local distribution company.
Engineering Design Hydro One Networks Canada/Acres International Ltd www.hydroone.com/ Canada http://www.hydroone.com/ 2005
Saba Project Site Visit and Operations Review Plant Substation and Machines review Engineering Design Stone & Webster Management Consultants Inc. (now Shaw Group USA www.shawgrp.com) www.shawgrp.com EXIM Bank USA USA http://www.shawgrp.com/ 2005 Annual site inspection for project lenders. Plant operations performance review and site inspections. Annual site inspection for project lenders. Plant operations performance review and site inspections. Detailed engineering review of substation and machines performance and standards comparisons.
Engineering Design Liberty Power Ltd. (235MW IPP) Owned by Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia Malaysia http://www.tnb.com.my/ 2001 Liberty Power Ltd. developed their own Gas Treatment Plant for gas supply. Gas Treatment plant control functions were required to be integrated into the main control system of Liberty Power Plant. * Collected data and developed raw drawings. * Checked all control functions and wiring numbering system. * Developed detailed drawings for control system of plant and SCADA system of gas treatment plant. * Updated existing drawings for its on site conditions.
Substation Design Review, Specification Development. Energy Meter Testing and Energy Accounting System, System Losses Analysis, Harmonic Analysis and Filter Design Plant Expansion, Generation Addition, and Utility Interconnection Analysis. Engineering Design Sitara Chemicals Industries Ltd. / 30MW Industrial Power System Faisalabad, Pakistan. Pakistan http://www.sitara.com.pk/ 2001 * System modeling, load flow studies with interconnection of utility system, and losses analysis. * Existing system Energy billing meters testing and Energy accounting system development. * Simulations for Energy losses confirmation and recommendations for reduction. * System Expansion studies, Load flow, Fault level. Relay settings, coordination, with utility interconnection and in-house generation additions. * Detailed Engineering Design Review of substation. * Equipment Specification Development. * Harmonic analysis, measurements and filter design.
Engineering Design Gulf Salt Power Company
ABB Services Company
Saudi Arabia http://www.gulfsalt.com/ 2001 Objectives/background/needs: Gulf Salt Power required independent third party to system studies with SEC grid and do engineering for protection relay setting. ABB further hired POWER-tek to provide the solutions. Key deliverables and solution provided: Load flow studies with utility interconnection for checking and confirming replaced transformer related to 890kW motor starting problems, System efficiency enhancement, losses reduction with optimized applications, Fault level simulations to get new values due to transformer replacement. Motor starting studies, Relay settings, coordination curves development.
Utility Interconnection Review for Distribution System Studies and Relay Coordination Engineering Design Gulf Salt Power Company www.gulfsalt.com ABB Services Company, Saudi Arabia Saudi Arabia http://www.gulfsalt.com/ 2001 Objectives/background/needs: Gulf Salt Power required independent third party to system studies with SEC grid and do engineering for protection relay setting. ABB further hired POWER-tek to provide the solutions. Key deliverables and solution provided: Load flow studies with utility interconnection. System efficiency enhancement, losses reduction with optimized applications, Fault level simulations. Motor starting studies, Relay settings, coordination curves development.
Power System Operational and Protection Audit for Analysis of Repeated Tripping of Machines due to Grid related problems. Engineering Design Fauji Kabirwala Power Company Ltd. FKPCL (157MW IPP) (El-Paso, USA) http://www.faujipower.com/ Pakistan http://www.faujipower.com/ 2001 * Extensive data collection of substations surrounding the FKPCL. * Relay Settings review and corrections. Confirmation checks and analysis. * Tripping analysis of lines and propagation of faults. * Fault analysis to determine reasons of certain operating configuration of the system. * Operational load flow analysis for reasons of certain operating configurations. * Steady State and Dynamic simulations/analysis. * Recommended solution through appropriate transmission network changes and protective equipment setting adjustments
Engineering Support for Commercial Operation Test for IPPs Engineering Design Liberty Power Ltd. (235MW IPP) Owned by Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia http://www.tnb.com.my/ Malaysia http://www.tnb.com.my/ 2001 · Planning and co-coordinating Commercial Operation Tests. · Development, Editing and negotiating Test Procedures. · Development Sample Test Calculations and Test Certifications. · Test Data collection, and Data processing and Data Recording. · Technical Analysis and providing assistance for interacting with Client’s Client and Contractors, and Independent Engineer. · Assistance in test analysis, Correspondence and Data Records. · Coordinating with WAPDA, IPP & matters related to Commercial Operation Tests.
Utility Corporate Financial Capability Analysis and Payment Security Analysis Engineering Design BHP Petroleum Pty Ltd. Australia. www.bhpbilliton.com/ Australia http://www.bhpbilliton.com/ 2001 · Data Collection from NEPRA for Financial Analysis and Payment Securities. · WAPDA Financial Analysis of Revenue, Disbursement, and Liabilities. · Draft Agreements Analysis and Options Developments. · Payments Options and Recommendations Development. · Meetings with other Suppliers and Parties to WAPDA. · Reporting, Presentations.
Engineering Support for Initial Dependable Capacity (IDC) and Other Privatization Aspects of Kot Addu Power Plant Engineering Design Stone & Webster Management Consultants Inc. (now Shaw Group USA www.shawgrp.com) for Privatization Commission of Pakistan. www.nukework.com Pakistan http://www.nukework.com/ 1999, 2000, 2001 · Worked as Local Representative to Stone & Webster for finalization of IDC matters. · Updating the reports. · Resolving the disputed technical matters related to IDC reports and different aspects of testing. · Meetings with Privatization Commission, KAPCO, WAPDA representatives.
Relay Setting of 235 MW Liberty Power Plant Sub-station, Connecting with Four Different Sub-stations Engineering Design Liberty Power Ltd. (235MW IPP) Owned by Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia http://www.tnb.com.my/ Malaysia http://www.tnb.com.my/ 1999 · Line distance data collection and verification. · Review of previous relay settings. · Provided over-current & distance relay-settings per measured line distances. · Updated fault level at the Liberty Plant substation bus. · Approval of relay settings from the utility. Report.
RTU Interconnection – Design, Installation, and Commissioning Assistance Engineering Design Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia Liberty Power Ltd. (235MW IPP) http://www.tnb.com.my/ Malaysia http://www.tnb.com.my/ 1999 * Design and installation services for RTU and plant data communication with National power control center. * Prepared all related interconnection drawings, installation drawings, cable plan, BOQ and RFP of all the related contractors for RTU, plant and VSAT equipment. * Extensive interaction with National power control center for SCADA software and hardware matters, and Input/Output signal approvals. * Interaction with different bidders and telecom equipment providers for all the negotiations, equipment selection, quality assurances. * Project management, and all the field and design support for project completion.
Technical Assistance for SCADA System Application for IPPs Engineering Design Liberty Power Ltd. (235MW IPP) Owned by Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia http://www.tnb.com.my/ Malaysia http://www.tnb.com.my/ 1999 * Engineering support services provided to IPPs for telecommunication system interfacing with surrounding grid system and National power control center. * Interaction with the utility for the required expansion of its existing microwave and PLC systems, being member of the “IPP Task Force for SCADA System” and other operating committees. * Contribution for technical and commercial plans of microwave system expansion for IPPs for the following activities: * Specification development, technical and commercial bid evaluation, negotiations, recommendations for the additional plant equipment of telecommunication system between plant and National power control center, Expansion of existing microwave system, Interim SCADA arrangement using VSAT technology, Remote terminal unit for SCADA and related equipment, Main and back up metering system. Report.
Load Management and Energy Efficiency Improvement Engineering Design USA 1998, 1999 * Data collection of energy consumption. * Load analysis and grouping, Load scheduling and re-rescheduling, Adjusting load profile with respect to time, TOU billing adjustments. * Monitoring system for MDI charges and Energy billing analysis. * Recommendations for energy efficiency improvements with/without investment. * Manpower training for energy reduction, Energy awareness seminars. * Implementation support and report.
Lighting and Electrical Design of Pakistan Motorway M-2 (Lahore-Islamabad) Engineering Design DAEWOO Corporation, Korea http://www.daewoo.com/ Korea 1998 * Site Survey. * Lighting design, Electrical Design, Development of drawings & Design approvals. * Installation supervision, quality control, reporting to the client for field quality. * Report.
Load Management and Energy Efficiency Improvement Engineering Design Syed Bhais Lighting (Pvt.) Ltd, Lahore http://www.syedbhais.com/ Pakistan http://www.syedbhais.com/ 1997, 1998, 1999 * Data collection of energy consumption. * Load analysis and grouping; Load scheduling and re-rescheduling, Adjusting load profile with respect to time, TOU billing adjustments. * Monitoring system for MDI charges and Energy billing analysis. * Recommendations for energy efficiency improvements with/without investment. * Manpower training for energy reduction, Energy awareness seminars. * Implementation support, and Report.
Load Management and Energy Efficiency Improvement Engineering Design Noble Textile Mills Ltd, Habibabad, near Lahore Reference: Malik Muhammad Ashique Pakistan 1997, 1998, 1999 * Data collection of energy consumption. * Load analysis and grouping, load scheduling and re-rescheduling, Adjusting load profile with respect to time, TOU billing adjustments. * Monitoring system for MDI charges and Energy billing analysis. * Recommendations for energy efficiency improvements with/without investment. * Manpower training programs for energy reduction and Energy awareness seminars for employees. * Implementation support, and report.
Exxon Electrical Distribution Network Relay Settings and Coordination Engineering Design Exxon (Engro) Chemicals Limited http://www.exxon.com/ Pakistan http://www.exxon.com/ 1996, 1997 * Complete design of protection system and relay protection coordination for an expanded system. * Review of previous relay settings. * Develop protection equipment curves library in the software in use of Exxon. * System optimization and detailed engineering. * Detailed engineering assistance for commissioning the facilities. * Training to Exxon engineers.
Technical Assistance for Telecommunication VSAT Link Development between Liberty Power Plant and National Power Control Centre Engineering Design Liberty Power Ltd. (235MW IPP) Owned by Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia Malaysia http://www.tnb.com.my/ 1997, 1998 Technical and support services to develop VSAT communication link for data transfer, voice and fax messages between plant and National Power Control Center: * Interaction with Vendors, Utility telecommunication engineers, approvals/ testing. * Recommendations for procurement of VSAT Telecommunication system equipment, Interim SCADA arrangement using VSAT technology. * Specification and BOQ approval from Utility. * Installation and testing, Quality assurance and Report.
Assistance in Plant-Grid Interconnection and Coordination Matters with Utility Engineering Design Liberty Power Ltd. (235MW IPP) Owned by Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia http://www.tnb.com.my/ Malaysia http://www.tnb.com.my/ 1996, 1997, 1998, 1999, 2000, 2001 IPP Support Services in dealing with client (a 17000MW Utility), Contractors, Owner Engineer, & Independent Engineer for all the technical matters covering diverse aspects of power purchase agreement, particularly plant interconnection with grid system involving: * Review of power purchase agreement. Discussions/negotiations to resolve technical matters related to power purchase agreement. * Telecommunications, speech and data transfer, transmission line, substation design, protection, tele-protection, metering and testing, National power control center data and technical interfacing. * Power Line Carrier (PLC) telecommunication equipment specification, system drawings, and BOQ development, technical and commercial bid evaluation, negotiations, recommendations for Power Line Carrier telecommunication equipment procurement, Specification and BOQ approval from Utility, Installation and testing, quality assurance. * Assistance: plant start-up, commissioning/acceptance of interconnection facilities. * Project Management, follow-up and coordination of the day-to-day progress with utility, IPP and other parties for construction, testing, and commissioning activities.
Solar power generation connection – engineering cost estimates Over 12MW each, 21 solar power projects connection Power Generation Support Services Sky Power Ltd. www.skypower.com A major Solar Project Developer in North America. Owns utility-scale fully operating solar park. Over 1.5 GW of solar parks in pipeline or under construction or at various stages of development USA http://www.skypower.com/ 2011-2012 * Over 12MW each, over 21 solar power projects connection assessment studies. Prepare cost estimates based on cost allocation rules and published technical requirements, and. Interaction support with local distribution
Plant Construction Monitoring and Testing & Commissioning Witness/Monitoring/Review Lenders Independent Rep Engineers Power Generation Support Services Orient Power Company Ltd. Lahore Pakistan http://www.orient-power.com/ 225MW CCPP Balloki Pakistan http://www.orient-power.com/ 2007 * Site visits, verify and comment monthly progress reports from EPC contractor * Assess actual construction progress, review plans and costs as per EPC contracts * Identify, report, provide updates and discuss open issues * Reporting to Lenders and comment on any issues including progress, budget concerns and performance shortfalls * Review detailed test procedures and will confirm compliance with testing criteria set forth in EPC contracts. * Monitor pre-commissioning tests and achievements * Monitor and witness testing and commissioning of the plant. Monitor data collection procedure, testing instrumentation, and operating and testing personals, review test reports and verify data reduction procedures and correction calculations to the guarantee conditions. * Independent assessment of degree of satisfaction of the conditions for achieving substantial completion and final completion * Interface with EPC contractor and equipment suppliers for testing and commissioning and commercial operation * Assist in certification and signing off any certificates for final acceptance & COD
Plant Construction Monitoring and Testing & Commissioning Witness/Monitoring/Review Lenders Independent Rep Engineers Power Generation Support Services Sapphire Power Company Ltd, Lahore Pakistan http://www.sapphire.com.pk/home.htm 234MW CCPP Muridke Pakistan http://www.saphire.com.pk/ 2007 * Site visits, verify and comment monthly progress reports from EPC contractor * Assess actual construction progress, review plans and costs as per EPC contracts * Identify, report, provide updates and discuss open issues * Reporting to Lenders and comment on any issues including progress, budget concerns and performance shortfalls * Review detailed test procedures and will confirm compliance with testing criteria set forth in EPC contracts. * Monitor pre-commissioning tests and achievements * Monitor and witness testing and commissioning of the plant. Monitor data collection procedure, testing instrumentation, and operating and testing personals, review test reports and verify data reduction procedures and correction calculations to the guarantee conditions. * Independent assessment of degree of satisfaction of the conditions for achieving substantial completion and final completion * Interface with EPC contractor and equipment suppliers for testing and commissioning and commercial operation * Assist in certification and signing off any certificates for final acceptance & COD
Plant Construction Monitoring and Testing & Commissioning Witness/Monitoring/Review Lenders Independent Rep Engineers Power Generation Support Services Saif Power Company Ltd. Lahore Pakistan http://www.saifgroup.com/power.php 1000MW + 25000 MW RFP for new IPP generation projects in Ontario Canada Hydro One Networks Inc, Canada/Hatch Energy Ltd www.hydroone.com/ Pakistan http://www.hydroone.com/ 2007 * Site visits, verify and comment monthly progress reports from EPC contractor * Assess actual construction progress, review plans and costs as per EPC contracts * Identify, report, provide updates and discuss open issues * Reporting to Lenders and comment on any issues including progress, budget concerns and performance shortfalls * Review detailed test procedures and will confirm compliance with testing criteria set forth in EPC contracts. * Monitor pre-commissioning tests and achievements * Monitor and witness testing and commissioning of the plant. Monitor data collection procedure, testing instrumentation, and operating and testing personals, review test reports and verify data reduction procedures and correction calculations to the guarantee conditions. * Independent assessment of degree of satisfaction of the conditions for achieving substantial completion and final completion * Interface with EPC contractor and equipment suppliers for testing and commissioning and commercial operation * Assist in certification and signing off any certificates for final acceptance & COD
Power Plant Annual Technical Operations Review and Reporting Connection Assessment Study for 300 MW Wolfe Island Wind Farm Power Plant Project Connection Assessment Study for 100 MW Erie Wind Farm Development Project For IESO Ontario Canada Power Generation Support Services Saba Power Plant, Lahore Pakistan http://www.sabapower.com/ EXIM Bank USA, Canadian Renewable Energy Corporation AMEC Americas Ltd/ Canadian Renewable Energy Corporation www.amec.com/ AIM Power Corporation/MacViro Consultants Inc. 600 – 90 Allstate Parkway, Markham, ON L3R 6H3 Canada Independent Electricity System Operator (IESO) Canada www.ieso.ca/ Pakistan http://www.ieso.ca/ 2005 2004 2004 Annual site inspection for project lenders. Plant operations performance review and site inspections. Detailed engineering review of substation and machines performance and standards comparisons. * Data base review and quality checks for IMO controlled grid system model. * Load flow studies for new IPP connection for 300 MW. * Review of transmission interface loadings. * Voltage impact studies and contingency analysis, Local area impact review. * Transient stability studies and wind gust analysis. * Data base review and quality checks for IMO controlled grid system model. * Load flow studies for new IPP connection for about 150 and 100 MW. * Review of transmission interface loadings, linear analysis. * Voltage impact studies and contingency analysis, Local area impact review. * Transient stability studies and wind gust analysis. * Presentation and meetings with Hydro One Networks Inc. Toronto. * Report
Power Generation Support Services Cumberland Power Plant Tennessee Valley Authority (TVA), USA http://www.tva.gov/ 1101 Market Street, Chattanooga, TN 37402-2801 TVA Transmission Planning Department, MR5G USA http://www.tva.gov/ * Generator control data collection. * Review current system models used. * Investigate suitability & effectiveness. * Analytical tuning and evaluate power system stabilizer gain. * Testing for other system conditions. * Development of analytical settings/scheme. * PSS tuning training course at TVA
TVA Power Plants Excitation System Modeling Review and System Performance Improvements Power Generation Support Services Tennessee Valley Authority (TVA), USA http://www.tva.gov/ 1101 Market Street, Chattanooga, TN 37402-2801 TVA Transmission Planning Department, MR5G USa http://www.tva.gov/ 2002 * Initial Data Review and Logistics. * Describe Current Excitation System Models Used. * Site Visit and Inspection. * Derivation of Model Structure and Preliminary Settings. * Identify the Existing ‘As found’ Excitation System Model data in PTI PSS/E format. * Identify Testing Required to complete PSS/E model data. * System Studies to Evaluate Excitation System Settings ‘as found’. * System Studies to Evaluate Excitation System Settings Improvements. Report.
IPP Interconnection Impact Studies Power Transfer Request Studies Power Generation Support Services Tennessee Valley Authority (TVA), USA http://www.tva.gov/ 1101 Market Street, Chattanooga, TN 37402-2801 TVA Transmission Planning Department, MR5G USA http://www.tva.gov/ 2002 * System studies using PSS/E for a large number of IPP requests. Load flow, Stability Studies. * Power transfer studies for number of Marketers/ IPPs using MUST software. * Developed IPLAN routines to make studies Process Efficient. * Developed Studies Procedures/Methodology, Information Management System, QA System, Reports, Presentations. * Developed and documented study Process Improvements. * Progress reporting and keeping “Issues Log”. * Successfully completed 21 different Impact studies/tasks of IPP Interconnection.
Power Generation Support Services Liberty Power Ltd. (235MW IPP) Owned by Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia http://www.tnb.com.my/ Malaysia http://www.tnb.com.my/ 2001 Liberty Power Ltd. developed their own Gas Treatment Plant for gas supply. Gas Treatment plant control functions were required to be integrated into the main control system of Liberty Power Plant. * Collected data and developed raw drawings. * Checked all control functions and wiring numbering system. * Developed detailed drawings for control system of plant and SCADA system of gas treatment plant. * Updated existing drawings for its on site conditions.
Plant Expansion, Generation Addition, and Utility Interconnection Analysis. Substation Design Review, Specification Development. Energy Meter Testing and Energy Accounting System, System Losses Analysis, Harmonic Analysis and Filter Design Power Generation Support Services Sitara Chemicals Industries Ltd. Pakistan www.sitara.com.pk/ 30MW Industrial Power System Faisalabad, Pakistan. Pakistan http://www.sitara.com.pk/ 2001 * System modeling, load flow studies with interconnection of utility system, and losses analysis. * Existing system Energy billing meters testing and Energy accounting system development. * Simulations for Energy losses confirmation and recommendations for reduction. * System Expansion studies, Load flow, Fault level. Relay settings, coordination, with utility interconnection and in-house generation additions. * Detailed Engineering Design Review of substation. * Equipment Specification Development. * Harmonic analysis, measurements and filter design.
Generator/Utility Interconnection Review for Industrial Power System Studies and Relay Coordination Power System studies, and Relay-Settings Update after Transformer Replacement. Power Generation Support Services Gulf Salt Power Company, Saudi Arabia www.gulfsalt.com/ ABB Services Company, Al Khobar, Saudi Arabia Saudi Arabia http://www.gulfsalt.com/ 2001 * Load flow studies with utility interconnection for checking and confirming replaced transformer related to 890kW motor starting problems. * Fault level simulations to evaluate new values due to transformer replacement. * Motor starting studies. * Relay settings, coordination curves development.
Power Generation Support Services Fauji Kabirwala Power Company Ltd. FKPCL http://www.faujipower.com/ (157MW IPP) (El-Paso, USA) Pakistan http://www.faujipower.com/ 2001 * Extensive data collection of substations surrounding the FKPCL. * Relay Settings review and corrections. Confirmation checks and analysis. * Tripping analysis of lines and propagation of faults. * Fault analysis to determine reasons of certain operating configuration of the system. * Operational load flow analysis for reasons of certain operating configurations. * Steady State and Dynamic simulations/analysis. * Recommended solution through appropriate transmission network changes and protective equipment setting adjustments
Power Generation Support Services NEPCO/ENRON, Redmond, Washington, USA Fauji Kabirwala Power Company Ltd. (157MW IPP) http://www.faujipower.com/ Pakistan http://www.faujipower.com/ * Steady state load flow studies and contingency analysis using PSS/E software. * Evaluation of transmission system capacity and system losses. * Short circuit & stability studies to evaluate the plant interaction with grid system. * Recommendation of remedial measures to overcome transmission constraints causing problems for plant to remain in synchronism with grid system. * Review of transmission plans in the region and recommendation of changes, with prioritized transmission line additions. * Development of recommendations for the IPP and relevant utility.
Owner Engineer’s and Local Technical Support Power Generation Support Services Liberty Power Ltd. (235MW IPP) Owned by Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia http://www.tnb.com.my/ Malaysia http://www.tnb.com.my/ 1996-2001 Design review for submission to the utility and detailed interaction for approvals. Extensive interaction with EPC Contractors and Independent Engineer for all the technical matters covering diverse aspects of power purchase agreement, particularly plant interconnection with grid system involving: * Project Management, monitoring, follow-up and coordination of the day-to-day progress with EPC contractor, utility and other parties for construction, testing, and commissioning activities. * Support and advice during commissioning and start up. * Review of power purchase agreement. Discussions/negotiations to resolve technical matters related to power purchase agreement. * Telecommunications, speech and data transfer, transmission line, substation design, protection, tele-protection, metering and testing, National power control center data and technical interfacing. * Power Line Carrier (PLC) telecommunication equipment specification, system drawings, and BOQ development, technical and commercial bid evaluation, negotiations, recommendations for Power Line Carrier telecommunication equipment procurement, Specification and BOQ approval from Utility, Installation and testing, quality assurance. * Assistance: plant start-up, commissioning/acceptance of interconnection facilities. * Weekly and monthly reports.
Commercial Operation Test for IPPs Review and Monitoring Power Generation Support Services Liberty Power Ltd. (235MW IPP) Owned by Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia http://www.tnb.com.my/ Malaysia http://www.tnb.com.my/ 2001 * Planning and co-coordinating Commercial Operation Tests. * Development, Editing and negotiating Test Procedures. * Development Sample Test Calculations and Test Certifications. * Test Data collection, and Data processing and Data Recording. * Technical Analysis and providing assistance for interacting with Client’s Client and Contractors, and Independent Engineer. * Assistance in test analysis, Correspondence and Data Records. * Coordinating with WAPDA, IPP & matters related to Commercial Operation Tests.
Power Generation Support Services Liberty Power Ltd. (235MW IPP) Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia http://www.tnb.com.my/ Malaysia http://www.tnb.com.my/ 1999 * Power system studies using PSS/E software to identify and propose remedial solutions for removing inherent transmission constraints in dispersing plant’s power under different operating scenarios. * Load rejection/Load variation test simulations for evaluating plant reliability. * Short circuit studies. * Stability analysis to check plant interaction with the grid system along with some adjustment of Excitation system parameters. * Determine of the benefits contributed by Liberty Plant to Utility’s power system. * Development of recommendations for Liberty Power Ltd. and for the utility.
Initial Dependable Capacity (IDC) and Other Privatization Aspects of Kot Addu Power Plant Power Generation Support Services Kot Addu Power Plant http://www.kapco.com.pk/ Stone & Webster Inc. USA. for Privatization Commission of Pakistan.: Pakistan http://www.kapco.com.pk/ 1999-2001 * Worked as Local Representative to Stone & Webster for finalization of IDC matters. * Updating the reports. * Resolving the disputed technical matters related to IDC reports and different aspects of testing. * Meetings with Privatization Commission, KAPCO, WAPDA representatives.
Power Generation Support Services Liberty Power Ltd. (235MW IPP) Owned by Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia http://www.tnb.com.my/ Malaysia http://www.tnb.com.my/ * Line distance data collection and verification. * Review of previous relay settings. * Provided over-current & distance relay-settings per measured line distances. * Updated fault level at the Liberty Plant substation bus. * Approval of relay settings from the utility. Report.
RTU Interconnection – Design, Installation, and Commissioning Assistance Power Generation Support Services Liberty Power Ltd. (235MW IPP) Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia http://www.tnb.com.my/ Malaysia http://www.tnb.com.my/ 1999 * Design and installation services for RTU and plant data communication with National power control center. * Prepared all related interconnection drawings, installation drawings, cable plan, BOQ and RFP of all the related contractors for RTU, plant and VSAT equipment. * Extensive interaction with National power control center for SCADA software and hardware matters, and Input/Output signal approvals. * Interaction with different bidders and telecom equipment providers for all the negotiations, equipment selection, quality assurances. * Project management, and all the field and design support for project completion.
Technical Assistance for SCADA System Application for IPPs Power Generation Support Services Liberty Power Ltd. (235MW IPP) Owned by Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia http://www.tnb.com.my/ Malaysia http://www.tnb.com.my/ 1999 * Engineering support services provided to IPPs for telecommunication system interfacing with surrounding grid system and National power control center. * Interaction with the utility for the required expansion of its existing microwave and PLC systems, being member of the “IPP Task Force for SCADA System” and other operating committees. * Contribution for technical and commercial plans of microwave system expansion for IPPs for the following activities: * Specification development, technical and commercial bid evaluation, negotiations, recommendations for the additional plant equipment of telecommunication system between plant and National power control center, Expansion of existing microwave system, Interim SCADA arrangement using VSAT technology, Remote terminal unit for SCADA and related equipment, Main and back up metering system. Report.
Generation Plant Substation: Tripping Analysis, Failure Analysis and New Relay Settings for 115kV King Fahad Industrial Port Jubail Substation SCECO Power Generation Support Services King Fahad Industrial Port Jubail Substation SCECO ABB Services Company, Al Khobar, Saudi Arabia http://www.abb.com/ Saudi Arabia http://www.abb.com/ 1999 * Finding the reasons of previous protection failures through analysis of past events and review of previous relay setting report. * Provided complete new relay settings of the substation. * Suggestions for future precautions and Report.
New Generation Capacity Addition: Exxon Electrical Distribution Network Relay Settings and Coordination Power Generation Support Services Generation Capacity Addition Project Exxon (Engro) Chemicals Limited http://www.exxon.com/ Pakistan http://www.exxon.com/ 1996-97 * Complete design of protection system and relay protection coordination for an expanded system. * Review of previous relay settings. * Develop protection equipment curves library in the software in use of Exxon. * System optimization and detailed engineering. * Detailed engineering assistance for commissioning the facilities. * Training to Exxon engineers.
Power Generation Support Services 727MW AES Lal Pir Power Plants AES Lal Pir, Pakistan http://www.lalpir.com/ Pakistan http://www.lalpir.com/ 1997-98 * Detailed System simulations/analysis to recommend practical system operational adjustments in order to overcome power flow constraints for facilitating full dispatch of both AES plants and for plants reactive power capability testing. * Review/document National power control center system available resources/ conditions, dispatch methodology/issues for IPPs and public sector plants. * Detailed system dispatch simulations to optimize losses with incremental generation cost to develop economic dispatch order & to find expected dispatch share/limit of AES plants with respect to other existing on-line & future plants. * Recommendations to maximize AES plant factor. Report.
Design Review for Telecommunication VSAT Link Development between Liberty Power Plant and National Power Control Centre Power Generation Support Services Liberty Power Ltd. (235MW IPP) Owned by Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia http://www.tnb.com.my/ Malaysia http://www.tnb.com.my/ 1997-98 Technical and support services to develop VSAT communication link for data transfer, voice and fax messages between plant and National Power Control Center: * Interaction with Vendors, Utility telecommunication engineers, approvals/ testing. * Recommendations for procurement of VSAT Telecommunication system equipment, Interim SCADA arrangement using VSAT technology. * Specification and BOQ approval from Utility. * Installation and testing, Quality assurance and Report.
Smart Grid Fund – Primary project: Load Aggregation and Control Projects GIS & Smart Grid Ontario Ministry of Energy, Toronto, Ontario Canada http://www.energy.gov.on.ca/en/ Canada http://www.energy.gov.on.caen/ 2013, 2014, 2015, 2016 Review and technical advice on Primary project; electricity load aggregation and control technologies including technologies related to communication and control of industrial and commercial equipment; and interface with electricity system operator (IESO Ontario). Assessment of any technical risks and proposed mitigation strategy, including safety, privacy and security risks. Assessment of technical aspects of commercialization risks and proposed mitigation strategy, including whether solution provides benefits to electricity utilities, intellectual property protection, and adherence to relevant codes and standards.
Smart Meter Cybersecurity Smart Grid Fund – Secondary project GIS & Smart Grid Ontario Ministry of Energy, Toronto, Ontario Canada Canada http://www.energy.gov.on.caen/ 2013, 2014, 2015, 2016 Provide support and review to Customer on Secondary projects. Support to the Customer to monitor project progress and achieve objectives. Review deliverables specifications, site visits, quality review, and test monitoring.
Commercial Customer Energy Management System Smart Grid Fund – Secondary project GIS & Smart Grid Ontario Ministry of Energy, Toronto, Ontario Canada Canada http://www.energy.gov.on.caen/ 2013, 2014, 2015, 2016 Provide support and review to Customer on Secondary projects. Support to the Customer to monitor project progress and achieve objectives. Review deliverables specifications, site visits, quality review, and test monitoring.
Research and Development Centre Smart Grid Fund – Secondary project GIS & Smart Grid Ontario Ministry of Energy, Toronto, Ontario Canada Canada http://www.energy.gov.on.caen/ 2013, 2014, 2015, 2016 Provide support and review to Customer on Secondary projects. Support to the Customer to monitor project progress and achieve objectives. Review deliverables specifications, site visits, quality review, and test monitoring.
Smart Grid Community Project Smart Grid Fund – Secondary project GIS & Smart Grid Ontario Ministry of Energy, Toronto, Ontario Canada Canada http://www.energy.gov.on.caen/ 2013, 2014, 2015, 2016 Provide support and review to Customer on Secondary projects. Support to the Customer to monitor project progress and achieve objectives. Review deliverables specifications, site visits, quality review, and test monitoring.
Embedded Smart Grid Application Platform for Distributed Smart Grid Fund – Secondary project GIS & Smart Grid Ontario Ministry of Energy, Toronto, Ontario Canada Canada http://www.energy.gov.on.caen/ 2013, 2014, 2015, 2016 Provide support and review to Customer on Secondary projects. Support to the Customer to monitor project progress and achieve objectives. Review deliverables specifications, site visits, quality review, and test monitoring.
Intelligence and Generation Smart Grid Fund – Secondary project GIS & Smart Grid Ontario Ministry of Energy, Toronto, Ontario Canada Canada http://www.energy.gov.on.caen/ 2013, 2014, 2015, 2016 Provide support and review to Customer on Secondary projects. Support to the Customer to monitor project progress and achieve objectives. Review deliverables specifications, site visits, quality review, and test monitoring.
Distribution Monitoring and Control Smart Grid Fund – Secondary project GIS & Smart Grid Ontario Ministry of Energy, Toronto, Ontario Canada Canada http://www.energy.gov.on.caen/ 2013, 2014, 2015, 2016 Provide support and review to Ministry on Secondary projects. Support to the Customer to monitor project progress and achieve objectives. Review deliverables specifications, site visits, quality review, and test monitoring.
Smart Grid Power Technologies Smart Grid Fund – Secondary project GIS & Smart Grid Ontario Ministry of Energy, Toronto, Ontario Canada Canada http://www.energy.gov.on.caen/ 2013, 2014, 2015, 2016 Provide support and review to Customer on Secondary projects. Support to the Customer to monitor project progress and achieve objectives. Review deliverables specifications, site visits, quality review, and test monitoring.
Advanced Distribution Energy Management Smart Grid Fund – Secondary project GIS & Smart Grid Ontario Ministry of Energy, Toronto, Ontario Canada Canada http://www.energy.gov.on.caen/ 2013, 2014, 2015, 2016 Provide support and review to Customer on Secondary projects. Support to the Customer to monitor project progress and achieve objectives. Review deliverables specifications, site visits, quality review, and test monitoring.
WiMax for Smart Grid Communications Smart Grid Fund – Secondary project GIS & Smart Grid Ontario Ministry of Energy, Toronto, Ontario Canada Canada http://www.energy.gov.on.caen/ 2013, 2014, 2015, 2016 Provide support and review to Customer on Secondary projects. Support to the Customer to monitor project progress and achieve objectives. Review deliverables specifications, site visits, quality review, and test monitoring.
Region of Durham Smart Grid Demonstration Smart Grid Fund – Secondary project GIS & Smart Grid Ontario Ministry of Energy, Toronto, Ontario Canada Canada http://www.energy.gov.on.caen/ 2013, 2014, 2015, 2016 Provide support and review to Customer on Secondary projects. Support to the Customer to monitor project progress and achieve objectives. Review deliverables specifications, site visits, quality review, and test monitoring.
GIS & Smart Grid High-tech GSM Solution Company Canada 2011 * Development of mobile application for mobile data backup. * Development of web based content management system for the management of user mobile data. * Key Deliverable: web based software for mobile data backup and management of user mobile data
Education Information System GIS & Smart Grid ER Solutions USA 2010 * Development of GIS solution for Education department of * Integration of GIS System with legacy system * Key Deliverable: web based management tool for schools the district
GIS & Smart Grid United Nations Development Program USA http://www.un.org/ 2010 * Development of GIS based project management tool for Planning and Development department of the province * Development of Spatial Database in Oracle * Integration of Oracle data with Google earth * Key Deliverable: web based project management software for Planning and Development department
Route Planning for railway line GIS & Smart Grid ILF Pvt. Ltd USA http://www.ilf.com/ 2009 * Image processing of the project area * Development of Digital terrain model and digital elevation model of the project area * Hydrological modeling * Cut and Fill Calculation * Key Deliverable: GIS based tool for route planning of railway lines.
Route Planning of Gas Pipeline GIS & Smart Grid ILF Pvt. Ltd USA http://www.ilf.com/ 2009 * Image acquisition and processing of project area. * Development of digital terrain model and 3D move of the gas pipeline route. * Key Deliverable: GIS tool for the optimal route planning of Iran Pakistan Gas pipeline.
Detailed Design for Integration of Gas Treatment Plant SCADA System With Power Plant Control Functions. GIS & Smart Grid Liberty Power Ltd. (235MW IPP) Owned by Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia Malaysia http://www.tnb.com.my/ 2001 Liberty Power Ltd. developed their own Gas Treatment Plant for gas supply. Gas Treatment plant control functions were required to be integrated into the main control system of Liberty Power Plant. * Collected data and developed raw drawings. * Checked all control functions and wiring numbering system. * Developed detailed drawings for control system of plant and SCADA system of gas treatment plant. * Updated existing drawings for its on site conditions.
Technical Assistance for Telecommunication VSAT Link Development between Liberty Power Plant and National Power Control Centre GIS & Smart Grid Liberty Power Ltd. (235MW IPP) Owned by Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia Malaysia http://www.tnb.com.my/ 1998, 1998 * Technical and support services to develop VSAT communication link for data transfer, voice and fax messages between plant and National Power Control Center: * Interaction with Vendors, Utility telecommunication engineers, approvals/ testing. * Recommendations for procurement of VSAT Telecommunication system equipment, Interim SCADA arrangement using VSAT technology. * Specification and BOQ approval from Utility. * Installation and testing, Quality assurance and Report.
SCADA System Application Liberty Power Plant and National Power Control Centre GIS & Smart Grid Liberty Power Ltd. (235MW IPP) Owned by Tenaga Nasional Generation Sdn Bhd, Kuala Lumpur, Malaysia Malaysia http://www.tnb.com.my/ 1999 * Engineering support services provided to IPPs for telecommunication system interfacing with surrounding grid system and National power control center. * Interaction with the utility for the required expansion of its existing microwave and PLC systems, being member of the “IPP Task Force for SCADA System” and other operating committees. * Contribution for technical and commercial plans of microwave system expansion for IPPs for the following activities: * Specification development, technical and commercial bid evaluation, negotiations, recommendations for the additional plant equipment of telecommunication system between plant and National power control center, Expansion of existing microwave system, Interim SCADA arrangement using VSAT technology, Remote terminal unit for SCADA and related equipment, Main and back up metering system. Report.