The Power-Tek Brief
N-1 Contingency Analysis: How Much Load Can You Serve?
N-1 Contingency Analysis: How Much Load Can You Serve? N-1 contingency analysis evaluates system performance after a specified single contingency,...
Read MoreData Center BESS: When Can Storage Defer a Grid Upgrade?
Data Center BESS: When Can Storage Defer a Grid Upgrade? A data center BESS can sometimes reduce the loading that...
Read MoreShort Circuit Study: Fault Duty Before Equipment Procurement
Short Circuit Study: Fault Duty Before Equipment Procurement A short circuit study calculates the currents that can flow during electrical...
Read MoreData Center Dynamic Load Models: What Utilities Need to Know
Data Center Dynamic Load Models: What Utilities Need to Know A data center interconnection study usually starts with megawatts. How...
Read MoreData Center Grid Interconnection: Test the Power Path Before Committing to the Site
Data Center Grid Interconnection: Test the Power Path Before Committing to the Site A transmission line beside a property is...
Read MoreUtility Load Forecasting When Data Center Demand Is Uncertain
Utility Load Forecasting When Data Center Demand Is Uncertain Imagine a utility receives five data center requests. Together they total...
Read MoreUtility Large Load Planning: Why Data Center Requests Must Be Evaluated as a Portfolio
Utility Large Load Planning: Why Data Center Requests Must Be Evaluated as a Portfolio A utility may receive ten data...
Read MoreERCOT Batch Zero: What Large Load Applicants Need to Know
ERCOT Batch Zero: What Large Load Applicants Need to Know ERCOT’s Batch Zero process represents a major change in large-load...
Read MoreData Center Dynamic Load Modeling: Five Tests Utilities Should Require
Data Center Dynamic Load Modeling: Five Tests Utilities Should Require A data center interconnection request often arrives as a capacity...
Read MoreFlexible Data Centers May Become the Next Grid Advantage
Flexible Data Centers May Become the Next Grid Advantage Why AI infrastructure, large-load interconnection, BESS coordination, and utility planning may...
Read MoreBehind-the-Meter Power Does Not Eliminate Grid Risk
Behind-the-Meter Power Does Not Eliminate Grid Risk Why data centers with co-located generation, BESS, and backup supply still need interconnection...
Read MoreGrid-Ready Siting Is Becoming the New Data Center Advantage
Grid-Ready Siting Is Becoming the New Data Center Advantage Why AI infrastructure site selection now depends on power availability, interconnection...
Read MoreDeliverable Capacity Is Becoming the New Currency of Grid Planning
Deliverable Capacity Is Becoming the New Currency of Grid Planning Why data centers, industrial loads, BESS, and utility capital plans...
Read MoreNot All Megawatts Behave the Same
Not All Megawatts Behave the Same Why data center load behavior, dynamic studies, EMT modeling, protection coordination, and power quality...
Read MoreSpeed to Power Is a Reliability Test
Speed to Power Is a Reliability Test Why data centers, AI infrastructure, and large-load projects need early grid analysis before...
Read MoreData Centers Are Changing Utility Planning Forever
Data Centers Are Changing Utility Planning Forever Why AI infrastructure, large-load interconnection, transmission planning, and grid modernization now require a...
Read More