Smart Grid Fund, Primary project – Load Aggregation and Control Projects, Ministry of Energy Ontario
Review and technical advice on Primary project; electricity load aggregation and control technologies including technologies related to communication and control of industrial and commercial equipment; and interface with electricity system operator (IESO Ontario). Assessment of any technical risks and proposed mitigation strategy, including safety, privacy and security risks. Assessment of technical aspects of commercialization risks and proposed mitigation strategy, including whether solution provides benefits to electricity utilities, intellectual property protection, and adherence to relevant codes and standards. Provide support and information to Ministry on Secondary projects.
System Impact Studies of 5400MW hydro plant including overall 12861 MW hydro power plants, 765kV power transmission, and rank the alternatives of 765kV or 500kV power transmission – National Transmission and Dispatch Company Ltd.