Overview: Transmission planning involves assumptions about factors like generation and load growth, but over time, these assumptions can change. A recent transmission project in Alberta, Canada faced unexpectedly high renewable generation growth, surpassing initial forecasts. The project, a 135 km double-circuit 240 kV line, was planned to use standard ACSR conductors, but the rapid growth in..
Reassess & Redirect – Stand down from crisis mode.