NERC Compliance, transmission system stability study Baseline Stability Limits of the AEC Power System
Objectives/background/needs: AEC required periodic NERC compliance studies and submission to SERC/NERC. Key deliverables and solution provided: Review of PSS/E data quality for AEC region, (load flow + stability models from SERC), Verify stability data and models for AEC machines, Load flow stressed cases set-up, System stability studies using stressed cases,