GENERATION CONNECTION IMPACT STUDIES – BRITISH COLOMBIA TRANSMISSION CORPORATION, VANCOUVER, BC, CANADA
Objectives/background/needs: BC Hydro had work load for generation connection assessment with pressing and tight timelines under renewable generation projects incentives.
Key deliverables and solution provided: Extensive generation interconnection impact studies using PSS/E for a number of generation requests. Load Flow, Stability Studies. POWER-tek helped meeting the timelines and quality completion of the studies and workload.