CONNECTION ASSESSMENT STUDY FOR 100 MW ERIE WIND FARM DEVELOPMENT PROJECT FOR IESO ONTARIO CANADA
Data base review and quality checks for IESO controlled grid system model. Load flow studies for new connection for about 150 and 100 MW. Review interface loadings, linear analysis, Voltage impact studies and contingency analysis, Local area impact review, Transient stability studies & wind gust analysis.
Presentation and meetings with Hydro One Networks Inc. & IESO.