Wolfe Island Wind Farm Study – AMEC
Connection assessment study for the 300 MW Wolfe Island wind farm project – AMEC Americas Ltd.
Data base review and quality checks for IESO controlled grid system model. Load flow studies for new connection for about 300 MW. Review interface loadings, linear analysis, voltage impact studies and contingency analysis, local area impact review, transient stability studies & wind gust analysis. Presentation and meetings with Hydro One Networks Inc. & IESO.
Erie Wind Farm Connection Study – IESO
Connection assessment study for the 100 MW Erie wind farm development project for IESO Ontario, Canada.
Data base review and quality checks for IESO controlled grid system model. Load flow studies for new connection for about 150 and 100 MW. Review interface loadings, linear analysis, voltage impact studies and contingency analysis, local area impact review, transient stability studies & wind gust analysis. Presentation and meetings with Hydro One Networks Inc. & IESO.
Solar Connection Assessment – Various Projects
Solar power generation connection assessment studies and engineering cost estimates.
Over 12MW each, over 21 solar power project connection assessment studies. Performed power system model analysis, detailed simulations, connection assessment studies, prepared planning specifications, and cost estimates based on cost allocation rules and technical requirements. Supported interactions with local distribution companies. Key deliverable: POWER-tek re-evaluated connection assessment studies and reviewed cost estimates, resulting in significant capital cost reduction for the developer.
Erie Wind Farm Assessment – IESO
Connection assessment study for the 100 MW Erie wind farm development project.
Data base review and quality checks for IESO controlled grid system model. Load flow studies for new wind farm generation plant connection for about 150 and 100 MW. Review of transmission interface loadings, linear analysis. Voltage impact studies and contingency analysis, local area impact review. Transient stability studies and wind gust analysis. Presentation and meetings with Hydro One Networks Inc. Toronto.
Wolfe Island Wind Farm Connection Study
Connection assessment study for the 300 MW Wolfe Island wind farm power plant project.
Database review and quality checks for IESO controlled grid system model. Load flow studies for new wind farm power generation plant connection for 300 MW. Review of transmission interface loadings. Voltage impact studies and contingency analysis, local area impact review, transient stability studies, and wind gust analysis.