Transmission System Planning up to Year 2020 for Northern Part of Pakistan. (Transmission System Planning and Interconnection Impact Studies of 19 hydropower plants)

Objectives/background/needs: Prepare a comprehensive EHV/HV transmission system plan for proposed 19 large and medium size hydro power plants in a restructured & private environment.

Key deliverables and solution provided: System planning at EHV Transmission, sub-transmission & distribution level.  Prepared connection schemes, load flow, short circuit and stability studies, meeting grid code, System loss impact with &without incoming 19 hydro plants. System optimization.  Recommendations