Performing PJM Load Deliverability Test Analysis

Objectives/background/needs: PJM control center carries out a performance period testing for capacity emergency transfer limit.    Obtain assurance that the internal & external firm capacity resources can be delivered to the area experiencing a localized capacity emergency by carrying out the ‘Deliverability to the Load’ test.

Capacity emergency transfer limit (CETL) analysis using MUST and PSS/E.  Perform voltage and thermal load deliverability tests.

Key deliverables and solution provided: POWER-tek determined transfer capability & actual ability of the transmission system to support deliveries of energy to an electrical area experiencing a capacity emergency. POWER-tek identified and provided solutions to short comings.