Long Range Transmission Planning Study – South Mississippi Electric Power Association

Objectives/background/needs: SMEPA required their long term transmission system plan development.

Key deliverables and solution provided: Evaluate planning criteria and guidelines, stress cases, main and alternatives and selection criteria development, finalize cases and ranking, develop intermediate stages, economic analysis, preferred plan selection, stability assessment, PV/QV analysis,  identify reactive support, short circuit testing, final expansion plan, report.