Investigation of WAPDA and Karachi Electric Power Systems and Interconnection of Pakistan and Two Neighboring Countries

Objectives/background/needs: ABB

Key deliverables and solution provided: Identify stressed areas for analysis and planning, locations where voltage power flow can be close to limits, interconnection points & alternatives with neighboring countries, Impact of power transfer increase b/w countries for generation scenarios.   Evaluation of system strength, assessment report for expansion plans and impact on energy import/export.  Determine transfer capability among countries.