Generator/Utility Interconnection Review for Industrial Power System Studies and Relay Coordination Power System studies, and Relay-Settings Update after Transformer Replacement.

Load flow studies with utility interconnection for checking and confirming replaced transformer related to 890kW motor starting problems. Fault level simulations to evaluate new values due to transformer replacement. Motor starting studies. Relay settings, coordination curves development.