Objectives/background/needs: Due to increased incentives and focus on generation requirement, TVA had long back log for developers generation connection assessment applications.  TVA management required to clear up the back log in minimum possible time.

Key deliverables and solution provided: Successfully completed 21 different Impact studies/tasks of IPP Interconnection. System studies using PSS/E for a large number of IPP requests.  Load flow, Stability studies.

Power transfer studies for number of Marketers/ IPPs using MUST software. Developed IPLAN routines to make studies process efficient.  Developed studies procedures/methodology, information management system, QA system, reports, presentations. Developed and study process Improvements. Progress reporting  “Issues Log”.