Generation Connection Impact studies – British Colombia Transmission Corporation, Vancouver, BC, Canada

Objectives/background/needs: BC Hydro had work load for generation connection assessment with pressing and tight timelines under renewable generation projects incentives.

Key deliverables and solution provided: Extensive generation interconnection impact studies using PSS/E for a number of generation requests.   Load Flow, Stability Studies.  POWER-tek helped meeting the timelines and quality completion of the studies and workload.