Analytical Studies for Economic Dispatch, Transmission System Capacity, and Reactive Power Capability Test Simulations for 727MW AES Power Plants

Detailed System simulations/analysis to recommend practical system operational adjustments in order to overcome power flow constraints for facilitating full dispatch of both AES plants and for plants reactive power capability testing. Review/document National power control center system available resources/ conditions, dispatch methodology/issues for IPPs and public sector plants. Detailed system dispatch simulations to optimize losses with incremental generation cost to develop economic dispatch order & to find expected dispatch share/limit of AES plants with respect to other existing on-line & future plants. Recommendations to maximize AES plant factor. Report.